My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH ADOPT RESO FOR PR NO 15-6827
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - PH ADOPT RESO FOR PR NO 15-6827
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 5:42:11 PM
Creation date
6/12/2020 2:55:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75B
Date
6/16/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L S A FAIRVIEW BRIDGE REPLACEMENT AND STREET IMPROVEMENTS <br />(9TH STREET TO 16TH STREET( PROJECT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br />SANTA ANAL CALIFORNIA MAY 2020 <br />Civil Works Engineers. 2019a. Location Hydraulic Study. Santa Ana River Bridge at North Fairview <br />Street. State Bridge No. 5063 (184). October. <br />2019b. River Hydraulics Analysis. Fairview Avenue Widening & Bridge Replacement Santa <br />Ana, CA 91303. October. <br />County of Orange. 2012a. Orange County General Plan Chapter VI. Resources Element. <br />2012b. Susceptibility Map Update. Susceptibility Analysis -Santa Ana River. December. <br />Earth Mechanics, Inc. 2018. Preliminary Geotechnical Information. March 20. <br />Garden Grove Unified School District. 2019. Which School Will My Child Attend? Website: <br />https://www.ggusd.us/schools/#elementary (accessed August 2019). <br />Group Delta. 2019. Initial Site Assessment Fairview Street Improvements from 9th Street to 16th <br />Street and Bridge Replacement Project. May 30. <br />LSA Associates, Inc. 2018a. Natural Environment Study (Minimal Impacts). December. <br />__ 2018b. Traffic Impact Analysis. June. <br />__ 2019a. Historic Property Survey Report. June. <br />2019b. Noise Abatement Decision Report. June. <br />2019c. Noise Study Report. January. <br />2019d. Paleontological Analysis of the Fairview Street Improvements from 9th Street to 16th <br />Street and Bridge Replacement Project Santa Ana, Orange County, California. September 7. <br />2019e. Water Quality Memorandum: Fairview Street Improvements from 9th Street to 16th <br />Street and Bridge Replacement Project BRLS 5063(184). September 16. <br />OC Waste & Recycling. Frank R. Bowerman Landfill. Website: http://www.oclandfills.com/landfill/ <br />active/bowerman (accessed August 2019). <br />Orange County Water District. 2019a. Groundwater Management. Website: https://www.ocwd. <br />com/what-we-do/groundwater-management/ (accessed October 2019). <br />2019b. Groundwater Storage Level August 2019. Website: https://www.ocwd.com/media/ <br />8151/groundwater-storage-august-2019.pdf (accessed October 2019). <br />Orange County Water District, City of La Habra, and Irvine Ranch Water District. 2017. Basin 8-1 <br />Alternative. January 1. Website: https://www.ocwd.com/media/4918/basin-8-1-alternative- <br />final-report-1.pdf (accessed November 2019). <br />4-2 7 5 Bm4dWD\Final ISMND\Fairview Street Bridge Final ISMND.docx (OS/26/20) <br />
The URL can be used to link to this page
Your browser does not support the video tag.