Laserfiche WebLink
3.67% <br />ADOPTED <br />PROPOSED <br />REVENUE <br />FY 19-20 <br />%20-21 <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT <br />FEES <br />FEES <br />SECTION <br />PUBLIC WORKS AGENCY <br />05817002-51701 <br />Transportation Permits/Oversize/Overweight <br />Annual Permit(Per CALTRANS) Each <br />90.00 <br />90.00 <br />Single Trip Permit (Per CALTRANS) Each <br />16.00 <br />16.00 <br />Fax Processing Service (Optional) Per Fiscal Year <br />44.58 <br />44.58 <br />O11ll002-51701 <br />Building Moving Permits <br />Permit Fee (Per CALTRANS) Each <br />90.00 <br />10.00 <br />Building Under 1,D]Osq. h. Each <br />16.00 <br />16.00 <br />Ouilding 1p00sq. h. or over Each <br />16.00 <br />44.58 <br />Legal Weight/Sim Land Not Required <br />NOCbarge <br />No Charge <br />OIIIM02-5I991 <br />Banner and DecoraCwns <br />Application Fee Per Transaction <br />176.10 <br />182.56 <br />Removal Fee PerStreet Per Pole <br />176.10 <br />182.56 <br />0111ID02-51608 <br />Neeedox Permitsand Inspection <br />InitialiRenewal Permit Fee Per Publication <br />203.36 <br />210.82 <br />Annual Inspection Fee Per Location <br />52.88 <br />5Q82 <br />O11ll002-53707 <br />Curb Painting Per Foot <br />13.50 <br />1Q00 <br />Minimum <br />244.74 <br />253.72 <br />O11ll002-53707 <br />Street Signs <br />Actual Cost plus <br />Actual Cost plus <br />Actual StaffCost <br />ActuaISGff Cos[ <br />O11ll002-53707 <br />Street Sign Installation by Ciry Staff/Contractor <br />Actual ContractCost <br />Actual Contract Cost <br />plus Actual Staff Cost <br />plus Actual Stiff Cost <br />O11ll002-5M10 <br />Tree Health Alumist Evaluation <br />Actual Cost <br />Actual Cost <br />O11ll002-57010 <br />Tree Planting by Ciry Staff/Contractor <br />Actual Contract Cos[ <br />Actual Contract Cos[ <br />plus Actual Staff Cost <br />plus Actual Staff Cost <br />01117002-5ID10 <br />Tree Removal by City Staff/Contractor <br />Actual ContractCost <br />Actual ContrardCost <br />plus Actual Staff Cost <br />plus Actual Stiff Cost <br />0111ID02-SM10 <br />Tree Value Recovery <br />Actual Value at <br />Actual Value at <br />Time of Occurrence <br />Time of Occurrence <br />00IM02-5T010 <br />ETACTree Appeal Fee Each <br />202.49 <br />209.92 <br />0861M02-57720 <br />Ciry Street Map(2mX29-) <br />First Map Each <br />4.28 <br />4.44 <br />Additional Each <br />4.28 <br />4.44 <br />08617002-577I0 <br />Water System Map(62'XT8') Each <br />12.48 <br />12.94 <br />0861002-57770 <br />Sewer System Map (62'X7O') Each <br />12.48 <br />12.94 <br />1O1ll002-5MC6 <br />Geographic Information System)GIS) <br />Consultanths) Time <br />Actual Contract Cost <br />Actual Contract Cost <br />StaffDam <br />Actual Staff Cost <br />Aloe l Staff Co. <br />0861M02-56305 <br />Telecommunications Facility Application Each <br />1,154.27 <br />1,196.63 <br />0861M02-51704 <br />Telecommunications Facility Inspection Each <br />465.20 <br />482.27 <br />Cham,rd in addition to Sheet Wort Pernabli-perhoo Aces <br />0861002-56305 <br />Accelerated Plan Checkfor Public Improvements Per Hour <br />269.18 <br />278.02 <br />08617002-56305 <br />Traffic Analysts/Studies Plan Check Per Hour <br />247.85 <br />256.95 <br />0861M02-56305 <br />Improvement Plan Check <br />Per Hour Per Hour <br />20183 <br />208.20 <br />NOTE: Sheet, Sorm Drain, Traffic. Grading, Sewer <br />and Water Flan Check cod Shan Drain, Seweq Water <br />and FemmalSbadies. <br />086IM02-56305 <br />Surface Drainage Plan Check Per Hour <br />200.03 <br />200.20 <br />0861ID02-56305 <br />Improvement Standard Plans/Specifications <br />Storm Drains Set <br />1A55 <br />15.00 <br />streetlmprovements Set <br />18.71 <br />19.39 <br />Sanitary Sewers Set <br />14.55 <br />15.08 <br />Water lm provements Set <br />24.93 <br />25.84 <br />75A*2-58 <br />