Laserfiche WebLink
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION FAIRVIEw BRIDGE REPLACEMENT AND STREET IMPROVEMENTS L S A <br />MAY 2020 (9TH STREET TO 16TH STREET) PROJECT <br />SANTA ANA. CALIFORNIA <br />Table 3.17.D: 2021 ADT Volumes and Roadway Segment LOS <br />Roadway Segment Arterial Type Capacity ADT LOS <br />2017 Existing Condition <br />17th Street to 16th Street <br />4 Lanes Divided <br />37,500 <br />42,440 <br />F <br />Fairview <br />16th Street to 12th Street —Fairview Bridge <br />4 Lanes Undivided <br />25,000 <br />41,890 <br />F <br />Street <br />12th Street to 9th Street <br />4 Lanes Divided <br />37,500 <br />40,980 <br />F <br />9th Street to Civic Center Drive <br />6 Lanes Divided <br />56,300 <br />41,720 <br />C <br />2021 No Project Condition <br />17th Street to 16th Street <br />4 Lanes Divided <br />37,500 <br />42,910 <br />F <br />Fairview <br />16th Street to 12th Street —Fairview Bridge <br />4 Lanes Undivided <br />25,000 <br />42,350 <br />F <br />Street <br />12th Street to 9th Street <br />4 Lanes Divided <br />37,500 <br />41,430 <br />F <br />9th Street to Civic Center Drive <br />6 Lanes Divided <br />56,300 <br />42,180 <br />C <br />2021 Plus Project Condition <br />17th Street to 16th Street <br />4 Lanes Divided <br />37,500 <br />43,620 <br />F <br />Fairview <br />16th Street to 12th Street —Fairview Bridge <br />6 Lanes Divided <br />56,300 <br />43,050 <br />C <br />Street <br />12th Street to 9th Street <br />6 Lanes Divided <br />56,300 <br />42,110 <br />C <br />9th Street to Civic Center Drive <br />6 Lanes Divided <br />56,300 <br />42,880 <br />C <br />= unsatisfactory LOS <br />ADT = average daily traffic <br />LOS = level of service <br />v/c = volume -to -capacity ratio <br />12th Street, which operate better due to reductions in travel patterns (higher north -south <br />through traffic, while lower east -west turning movements at 17th Street) and changes in access <br />(12th Street). <br />Implementation of the proposed Project would result in prolonged delay for the eastbound left - <br />turn movements at the intersection of Fairview Street at 16th Street. This represents a <br />worsening of access conditions to 9 a.m. and 5 p.m. peak -hour conditions. As this resulting <br />deficient operation is indicative of only the worst -performing movement (the eastbound left - <br />turning vehicles in the p.m. peak hour), this delay value and LOS are not considered to be <br />indicative of the overall intersection and are not considered a significant impact. <br />As Table 3.17.D shows, the proposed increase in roadway capacity to Fairview Street south of <br />16th Street is anticipated to accommodate both ambient existing to 2021 traffic growth and <br />north -south regional traffic rebalancing at satisfactory LOS C. This is an improvement over both <br />existing and 2021 No Project overcapacity traffic conditions. In addition, as shown in Table <br />3.17.D, Fairview Street from 17th Street to 16th Street would continue to result in <br />unsatisfactory LOS F conditions. However, this segment is outside the Project limits. As <br />described earlier, the City's General Plan Circulation Element identifies Fairview Street as a 6- <br />lane Major Arterial Highway, including the segment between 17th Street and 16th Street. <br />Implementation of additional lanes within this roadway segment, consistent with the General <br />Plan, would eliminate the roadway deficiency. As part of its annual Capital Improvement <br />Program (CIP), the City conducts ongoing monitoring and collects citywide traffic data for all <br />arterials and intersections within the City. As part of this ongoing monitoring, the City <br />determines needed improvements and prioritizes projects for funding to address identified <br />congestion and/or safety concerns. The segment of Fairview Street between 17th Street and <br />16th Street is already identified as roadway link of concern. <br />R:\WKE1702\ISMND\Final ISMND\Fairview Street Bridge Final ISMND.docx (05/26/20) 3-97 <br />