Laserfiche WebLink
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION FAIRVIEw BRIDGE REPLACEMENT AND STREET IMPROVEMENTS L S A <br />MAY 2020 (9TH STREET TO 16TH STREET) PROJECT <br />SANTA ANA. CALIFORNIA <br />Table 3.17.F: 2040 ADT Volumes and Roadway Segment LOS <br />Roadway Segment I Arterial Type Capacity ADT LOS <br />2017 Existing Condition <br />17th Street to 16th Street <br />4 Lanes Divided <br />37,500 <br />42,440 <br />F <br />Fairview <br />16th Street to 12th Street —Fairview Bridge <br />4 Lanes Undivided <br />25,000 <br />41,890 <br />F <br />Street <br />12th Street to 9th Street <br />4 Lanes Divided <br />37,500 <br />40,980 <br />F <br />9th Street to Civic Center Drive <br />6 Lanes Divided <br />56,300 <br />41,720 <br />C <br />2040 No Project Condition <br />17th Street to 16th Street <br />4 Lanes Divided <br />37,500 <br />45,130 <br />F <br />Fairview <br />16th Street to 12th Street —Fairview Bridge <br />4 Lanes Undivided <br />25,000 <br />44,540 <br />F <br />Street <br />12th Street to 9th Street <br />4 Lanes Divided <br />37,500 <br />43,580 <br />F <br />9th Street to Civic Center Drive <br />6 Lanes Divided <br />56,300 <br />44,360 <br />C <br />2040 Plus Project Condition <br />17th Street to 16th Street <br />4 Lanes Divided <br />37,500 <br />49,200 <br />F <br />Fairview <br />16th Street to 12th Street —Fairview Bridge <br />6 Lanes Divided <br />56,300 <br />48,560 <br />D <br />Street <br />12th Street to 9th Street <br />6 Lanes Divided <br />56,300 <br />47,510 <br />D <br />9th Street to Civic Center Drive <br />6 Lanes Divided <br />56,300 <br />48,360 <br />D <br />= unsatisfactory LOS <br />ADT = average daily traffic <br />LOS = level of service <br />v/c = volume -to -capacity <br />due to the proposed improvements. Exceptions include the intersections of Fairview Street at <br />17th Street and 12th Street, which operate better due to reductions in travel patterns (higher <br />north -south through traffic while lower east -west turning movements at 17th Street) and <br />changes in access (12th Street). <br />The intersection of Fairview Street at 16th Street experiences a worsening of HCM-based delay <br />values in the 2040 p.m. peak hour from an acceptable 24.9 second/vehicle LOS C in the No <br />Project condition to an unacceptable 41.7 second/vehicle LOS E in the Plus Project condition. <br />This represents the calculated delay of the worst -performing movement in a given intersection <br />and is not indicative of the experience of the majority of vehicles traveling through these <br />intersections. As this resulting additional deficient operation is indicative of only the worst - <br />performing movement, in this case the 5 eastbound left -turning vehicles in the p.m. peak hour, <br />this delay value and LOS are not considered to be indicative of the overall intersection and are <br />not considered a significant impact. <br />Implementation of the proposed Project would result in an additional unsatisfactorily operating <br />intersection (the intersection of Fairview Street and Civic Center Drive) compared to the <br />deficient intersections identified under the 2040 No Build condition. Regional growth between <br />the existing and 2040 No Project conditions would contribute to the unacceptable peak -hour <br />operations at the intersection of Fairview Street at Civic Center Drive which could potentially <br />result in a significant impact. <br />As shown in Table 3.17.F, the proposed increase in roadway capacity for Fairview Street south of <br />16th Street is anticipated to accommodate 2040 traffic growth and north -south regional traffic <br />rebalancing resulting in satisfactory LOS D. This is an improvement over both existing and 2040 <br />No Project overcapacity traffic conditions. In addition, as shown in Table 3.17.F, Fairview Street <br />R:\WKE1702\ISMND\Final ISMND\Fairview Street Bridge Final ISMND.docx (05/26/20) 3-99 <br />