My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 16 20 PWA_02_02 Exh2 - IS-MND
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
06 16 20 PWA_02_02 Exh2 - IS-MND
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:31:53 AM
Creation date
6/16/2020 8:14:01 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L S A FAIRVIEw BRIDGE REPLACEMENT AND STREET IMPROVEMENTS (9TH STREET TO 16TH STREET) PROJECT <br />CITY OF SANTA ANA, CALIFORNIA <br />Table A.1: Mitigation Monitoring and Reporting Program <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />MAY 2020 <br />Responsible Party <br />Timing for <br />Completion <br />Mitigation Measures <br />Mitigation Measure <br />Date <br />3.7 GEOLOGY AND SOILS <br />Mitigation Measure GEO-1: Paleontological Resources Discovery. If paleontological resources are <br />City of Santa Ana Public <br />During ground - <br />encountered during the course of ground disturbance, the Construction Contractor shall stop work in the <br />Works Director/ <br />disturbing construction <br />immediate area of the find, notify the City Public Works Director or designee, and contact a qualified <br />Construction <br />activities <br />paleontologist to assess the find for scientific significance. If determined to be significant by the qualified <br />Contractor <br />paleontologist, the fossil shall be collected from the field. The qualified paleontologist may also make <br />recommendations regarding additional measures, such as paleontological monitoring and <br />documentation. If found, scientifically significant resources shall be prepared to the point of <br />identification, identified to the lowest taxonomic level possible, cataloged, and curated into the <br />permanent collections of a museum repository. If scientifically significant paleontological resources are <br />collected, a report of findings shall be prepared to document the collection. <br />3.8 GREENHOUSE GAS EMISSIONS <br />There are no significant impacts to greenhouse gas emissions. <br />3.9 HAZARDS AND HAZARDOUS MATERIALS <br />Mitigation Measure HAZ-1: Hazardous Materials Testing and Removal. During Project design and <br />Design Engineer/ <br />During Project design <br />construction, the Design Engineer and the Construction Contractor shall adhere to the requirements <br />Construction <br />and construction <br />listed below. Documentation of compliance with these requirements shall be provided to the City of <br />Contractor <br />Santa Ana (City) Public Works Director or designee. <br />• Treated wood waste will either be disposed of as a hazardous waste or tested and handled in <br />accordance with California Code of Regulations (CCR), Title 22, Division 4.5, Chapter 34 <br />• If not tested for lead and chromium prior to removal, yellow traffic striping shall be managed <br />consistent with California Department of Transportation (Caltrans) Standard Special Provision <br />14.11.12, Remove Yellow Traffic Stripe and Pavement Marking with Hazardous Waste Residue, or the <br />equivalent. <br />• Affected pole -mounted transformers will be removed by Southern California Edison personnel or <br />qualified contractors. <br />• A hazardous building materials survey, including asbestos -containing materials and lead -based paint, <br />will be conducted on the Fairview Street bridge, as well as any additional structures to be disturbed. <br />Hazardous building materials will be removed and disposed of consistent with the South Coast Air <br />Quality Management District (SCAQMD) Rules and Regulations and the California Health and Safety <br />Code. <br />• Any suspect hazardous waste found during construction activities will be handled, treated, or disposed <br />of consistent with local, State, and federal laws. <br />8 R:\WKE1702\ISMND\Final ISMND\Appendix D Fairview St Bridge MMRP.docx (05/26/20) <br />
The URL can be used to link to this page
Your browser does not support the video tag.