My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 16 20 PWA_02_02 Exh2 - IS-MND
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
06 16 20 PWA_02_02 Exh2 - IS-MND
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:31:53 AM
Creation date
6/16/2020 8:14:01 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LC A FAIRVIEw BRIDGE REPLACEMENT AND STREET IMPROVEMENTS (JTH STREET TO 16TH STREET) PROJECT <br />J A CITY OF SANTA ANA, CALIFORNIA <br />Table A.1: Mitigation Monitoring and Reporting Program <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />MAY 2020 <br />Responsible Party <br />Timing for <br />Completion <br />Mitigation Measures <br />Mitigation Measure <br />Date <br />Mitigation Measure UTL-2: Updated Utility Survey. During the design phase, the Project Engineer will <br />Project Engineer/ City <br />During Project design <br />provide the City of Santa Ana (City) Director of Public Works, or designee, with an updated utility survey <br />of Santa Ana Public <br />to update information on known utility facilities as well as previously unidentified/unknown or new <br />Works Director or <br />utility facilities within the disturbance limits. <br />designee <br />3.20 WILDFIRE <br />There are no significant impacts to wildfire. <br />Source: LSA Associates, Inc. (May 2020). <br />12 R:\WKE1702\ISMND\Final ISMND\Appendix D Fairview St Bridge MMRP.docx (05/26/20) <br />
The URL can be used to link to this page
Your browser does not support the video tag.