Laserfiche WebLink
LC A FAIRVIEw BRIDGE REPLACEMENT AND STREET IMPROVEMENTS (JTH STREET TO 16TH STREET) PROJECT <br />J A CITY OF SANTA ANA, CALIFORNIA <br />Table A.1: Mitigation Monitoring and Reporting Program <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />MAY 2020 <br />Responsible Party <br />Timing for <br />Completion <br />Mitigation Measures <br />Mitigation Measure <br />Date <br />Mitigation Measure UTL-2: Updated Utility Survey. During the design phase, the Project Engineer will <br />Project Engineer/ City <br />During Project design <br />provide the City of Santa Ana (City) Director of Public Works, or designee, with an updated utility survey <br />of Santa Ana Public <br />to update information on known utility facilities as well as previously unidentified/unknown or new <br />Works Director or <br />utility facilities within the disturbance limits. <br />designee <br />3.20 WILDFIRE <br />There are no significant impacts to wildfire. <br />Source: LSA Associates, Inc. (May 2020). <br />12 R:\WKE1702\ISMND\Final ISMND\Appendix D Fairview St Bridge MMRP.docx (05/26/20) <br />