My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 16 20 PWA_02_02 Exh2 - IS-MND
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
06 16 20 PWA_02_02 Exh2 - IS-MND
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:31:53 AM
Creation date
6/16/2020 8:14:01 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESPONSE TO COMMENTS FAIRVIEw BRIDGE REPLACEMENT AND STREET IMPROVEMENTS (9TH STREET TO 16TH STREET) PROJECT C A <br />MAY 2020 CITY OF SANTA ANA, CALIFORNIA J `(` <br />Table A.1: Response to Comments <br />Respondent <br />Comment <br />Number <br />Comment <br />Response <br />ongoing monitoring, the City determines needed improvements <br />and prioritizes projects for funding to address identified <br />congestion and/or safety concerns. In the future, as part of the <br />City's CIP program, the City may determine whether <br />improvements are needed to the intersection of Fairview Street <br />and 9th Street. <br />As stated in Section 3.17, Transportation, a Traffic Management <br />Plan (TMP) shall be prepared during final design and <br />implemented during construction to address impacts to local <br />circulation during construction. <br />Source: LSA Associates, Inc. (May 2020). <br />R:\wKE1702\ISMND\Final ISMND\Appendix G Fairview St Bridge Response to Comments.docx (05/26/20) <br />
The URL can be used to link to this page
Your browser does not support the video tag.