My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 16 20 PWA_02_02 Exh2 - IS-MND
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
06 16 20 PWA_02_02 Exh2 - IS-MND
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:31:53 AM
Creation date
6/16/2020 8:14:01 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d ,�+w� � � i O Q 3 t �� � _ •� <br />44 it <br />r <br />4 J r. �. x� "�! / ' roy •fin - ,,i -i, _ ' qF <br />41 <br />low <br />rw <br />L Or <br />ill <br />grow <br />! ,,_ *• _ 3 #or <br />ry ��+yw�C'� _ }•?i j:. X t � „'� t_ _ �g '-t �'l --mow .� j1, -t . ` j r` <br />AP <br />ir <br />116 <br />Ng t <br />;VISA Is <br />HL <br />Mi <br />y <br />LS A <br />LEGEND <br />Biological Study Area (BSA) <br />O Proposed Roadway Widening <br />Existing Pier Walls (0.09 acres total) <br />Corps of Engineers (4.18 acres) <br />_ <br />Proposed Pier Walls (0.05 acres total) <br />CDFW (5.55 acres) <br />o 100 200 <br />® <br />Potential Bike Detour in River* <br />FEET <br />*Note: Potential bike detour <br />SOURCE: Google (2018) <br />footprint is approximate. <br />FIGURE 4 <br />Fairview Bridge Replacement <br />and Street Improvements <br />(9th Street to 16th Street) Project <br />Aquatic Resources <br />I:\WKE1702\GIS\AquaticResources.mxd (2/17/2020) <br />
The URL can be used to link to this page
Your browser does not support the video tag.