My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 16 20 PWA_02_02 Exh2 - IS-MND
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
06 16 20 PWA_02_02 Exh2 - IS-MND
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:31:53 AM
Creation date
6/16/2020 8:14:01 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION FAIRVIEw BRIDGE REPLACEMENT AND STREET IMPROVEMENTS w <br />MAY 2020 (9TH STREET TO 16TH STREET) PROJECT <br />J" <br />SANTA ANA. CALIFORNIA <br />maintenance, staging, dispensing of fuel or oil, or any other such <br />activities shall occur in designated upland areas. The designated <br />upland areas shall be located in such a manner as to prevent any <br />spill runoff from entering Waters of the United States and other <br />jurisdictional waters. Silt fencing and straw wattle shall be placed in <br />such a manner that they are able to catch or filter sediment or other <br />construction -related debris to prevent it from entering aquatic <br />areas, where necessary. All construction -related debris and trash <br />shall be disposed of or secured to prevent any such waste from <br />entering aquatic areas. <br />Mitigation Measure BIO-9 Invasive Species. In order to prevent the spread of invasive species <br />(Executive Order 13112), the Construction Contractor shall ensure <br />that any plants removed or soil disturbed during the course of <br />construction are contained and properly disposed of off site. All <br />mulch, topsoil, seed mixes, or other plantings used during <br />landscaping activities and any erosion -control BMPs implemented <br />shall be free of invasive plant species seeds or propagules. No <br />vegetation listed on the California Invasive Plant Council (Cal-IPC) <br />inventory shall be installed on the Project, and all plant palettes <br />proposed for the Project shall be reviewed by a qualified biologist <br />during the Final Design phase. <br />R:\WKE1702\ISMND\Final ISMND\Fairview Street Bridge Final ISMND.docx (05/26/20) 3-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.