Laserfiche WebLink
L w FAIRVIEw BRIDGE REPLACEMENT AND STREET IMPROVEMENTS INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br />J' (9TH STREET TO 16TH STREET) PROJECT <br />MAY 2020 <br />SANTA ANAL CALIFORNIA <br />Fairview Street includes sidewalks on both sides of the street, with the exception of the segment on <br />the bridge. Fairview Street does not include any bicycle facilities, such as bicycle lanes. The proposed <br />Project would construct a complete bridge deck with barrier rails, sidewalks, bicycle lanes, a raised <br />median, and lighting to provide safe walkability and bicycle accommodations across the bridge <br />consistent with the goals and policies of the Circulation Element. <br />The Circulation Element also identifies Fairview Street as a planned widening project in Santa Ana. <br />The proposed Project includes replacing the existing four -lane bridge with a new six -lane bridge. <br />Therefore, the proposed Project is consistent with the goals and policies in the Circulation Element <br />and does not conflict with any plans applicable to the Project area and the proposed Project. <br />Therefore, the Project is consistent with any applicable land use plans, policies, or regulations <br />adopted for the purpose of avoiding or mitigating an environmental effect, and no impacts would <br />occur. No mitigation is required. <br />3-68 R:\WKE1702\ISMND\Final ISMND\Fairview Street Bridge Final ISMND.docx (05/26/20) <br />