My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix A Historic Property Survey Report
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
Appendix A Historic Property Survey Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:34:09 AM
Creation date
6/16/2020 8:15:43 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCHAEOLOGICAL SURVEY REPORT FAIRVIEW STREET IMPROVEMENTS FROM 9TH STREET TO 16TH STREET AND <br />JUNE 2019 BRIDGE REPLACEMENT PROJECT <br />SANTA ANA, CALIFORNIA <br />FIELD METHODS <br />On March 16, 2018, a pedestrian survey of portions of the APE was completed. Because much of the <br />project area is within Fairview Street right-of-way, the survey did not take place in all areas. Areas of <br />exposed ground, even if vegetated, were surveyed by walking linear transects separated by 7 to 10 <br />meters (23 to 33 feet) over larger areas and opportunistically over smaller areas. Special attention <br />was given to larger areas that exhibited exposed sediment, such as alongside the Santa Ana River <br />bike trail. Areas within the APE that were not surveyed included the central portion of the street. <br />Due to project access along the sidewalk, the sidewalk was surveyed, with focus being the many <br />open areas where palm trees are planted, as well as lawns and other open areas with and without <br />vegetative cover. <br />Q:\WKE1702\Cultural\ASR\ASR 2019 OS-21.docx (06/03/19) 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.