My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix A Historic Property Survey Report
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
Appendix A Historic Property Survey Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:34:09 AM
Creation date
6/16/2020 8:15:43 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sacred Lands File & Native American Contacts List Request <br />Native American Heritage Commission <br />1550 Harbor Blvd, Suite 100 <br />West Sacramento, CA 95691 <br />916-373-3710 <br />916-373-5471— Fax nahcknahc.ca.gov <br />Information Below is Required for a Sacred Lands File Search <br />Project: Fairview Bridge Widening <br />County: Orange <br />USGS Quadrangle Name: Anaheim (1981) <br />Township:05S Range: IOW Section(s): 11 <br />Company/Firm/Agency: LSA Associates, Inc. <br />Street Address: 20 Executive Park, Suite 200 <br />City: Irvine Zip: 92614 <br />Phone: 949-553-0666 <br />Fax: <br />Email: Joshua. Toney@lsa.net <br />Project Description: <br />The Proposed Project includes replacing the Fairview Street bridge over the Santa Ana River, widening <br />Fairview Street between 9th Street and 16th Street, and restriping the north and south ends to match <br />the existing condition in the City of Santa Ana (refer to Figures 1 and 2). The existing four -lane bridge <br />would be replaced with a new six -lane bridge (three lanes in each direction), including a complete <br />bridge deck with barrier rails, sidewalks, bicycle lanes, a raised median, and lighting. The existing four - <br />lane bridge is the only constraint in the Project Area for Fairview Street to be built out to its master - <br />planned width of six lanes. Fairview Street is designated as a six -lane Major Arterial, as shown in the <br />Orange County Master Plan of Arterial Highways and the City's General Plan Circulation Element. The <br />proposed bridge would have the same roadway profile as the existing bridge. <br />
The URL can be used to link to this page
Your browser does not support the video tag.