My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix A Natural Environment Study (Minimal Impacts)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
Appendix A Natural Environment Study (Minimal Impacts)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:35:34 AM
Creation date
6/16/2020 8:17:12 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JURISDICTIONAL DELINEATION REPORT FAIRVIEW STREET IMPROVEMENTS A <br />N OVEMBER 2018 FROM 9TH STREET TO 16TH STREET AND BRIDGE REPLACEMENT PROJECT `J" <br />SANTA ANA, CALIFORNIA <br />INTRODUCTION <br />The City of Santa Ana (City), in conjunction with the California Department of Transportation, <br />proposes to widen Fairview Street between 9th Street and 16th Street, including replacing the <br />Fairview Street bridge crossing over the Santa Ana River (proposed Project) in Santa Ana, California <br />(see Figure 1—all figures are attached in Appendix A). The purpose of the project is to reduce <br />congestion and improve pedestrian and bicyclist safety on Fairview Street between 9th Street and <br />16th Street, consistent with the Orange County Master Plan of Arterial Highways and the City's <br />General Plan Circulation Element. <br />South of 9th Street, Fairview Street provides three lanes in each direction which are reduced to two <br />lanes in each direction north of 9th Street, across the existing four -lane bridge, to 16th Street. The <br />Fairview Street segment between 9th Street and 16th Street is the only constraint for Fairview <br />Street to be built out to its planned width of six lanes. This condition causes a traffic "bottleneck" <br />during peak hours. In addition, there are no sidewalks, bikeways, or lighting on the existing bridge. <br />Pedestrians and bicyclists currently use the roadway shoulder to cross the bridge. <br />Within the project limits, Fairview Street is bordered by single-family residences and a few <br />commercial properties. <br />This Jurisdictional Delineation Report presents a description of the delineation of aquatic resources <br />potentially affected by the project and contains supporting information to be submitted to the <br />appropriate resource agencies during project environmental review and permitting. <br />\\vcorp12\projects\WKE1702\N ES- MI\November 2018 Sub mittal\Fairview Street I m proveme nts_Draft JD 110918.docx all/09/18» <br />
The URL can be used to link to this page
Your browser does not support the video tag.