Laserfiche WebLink
New Miscellaneous Fees FY 2020-21 <br />Planning and Buildino,Agencx <br />1. Entitlement Application Extension <br />FY 19-20 Fee: None <br />Adopted Fee: $27508.32 <br />SAMC Sec. 41-647 provides for entitlement extensions up to three years from the original two- <br />year expiration time -frames. Extension requests must be considered by the City Council, which <br />requires preparation of an RFCA and staff time. This fee reflects staff time spent preparing the <br />RFCA for City Council consideration. <br />2. Historic Register Removal/Demolition <br />FY 19-20 Fee: None <br />Adopted Fee: $57739.81 <br />SAMC Sec. 3-7 provides for requests to demolish properties on the historic register. These <br />requests must be considered by the Historic Resources Commission, which requires <br />preparation of a staff report and staff time. This fee reflects staff time spent preparing the <br />RFCA for City Council consideration. <br />Public Works Agency <br />3. Water Capacity Fees <br />FY 19-20 Fee: None <br />Adopted Fee: See table <br />5/8" <br />3/4" <br />1" <br />$930 <br />$1,395 <br />$27325 <br />1.5" <br />$4,650 <br />2" <br />$77440 <br />3" <br />$16,275 <br />4" <br />6" <br />$27,900 <br />$627775 <br />This new impact fee was a recommendation of the 2019 Water, Recycled Water, & Sewer <br />Rate Study, and will be charged to all new developments where a connection to the City's <br />water system will be established. There is currently no fee for this procedure within the <br />Water Resources Division. This differs from the "Install New Water Service Meter" fee in <br />that it is designed to fund the entirety of the water delivery infrastructure, not just the water <br />meter hardware. The fees shown in the table below are calculated based on the demand <br />the customer will place on the system, which is measured by size of the customer's water <br />m ete r. <br />