My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PALP, INC DBA EXCEL PAVING COMPANY
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
PALP, INC DBA EXCEL PAVING COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:47:40 PM
Creation date
6/30/2020 4:03:39 PM
Metadata
Fields
Template:
Contracts
Company Name
PALP, INC DBA EXCEL PAVING COMPANY
Contract #
18-9002
Agency
Public Works
Expiration Date
1/29/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tM. <br />CONTRACT CHANGE ORDER <br />Project Number Project Nos.18-9002: BUSH ST. BICYCLE BOULEVARD _Change Order Number 1 <br />To ExceLPavinft Co. Contractor <br />You are hereby directed to make the raisin changes from the plans and specifications or do the following descdbed work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such Ome as equipment Is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE <br />COP No. 03 R1 10th STREET EXTRA WOR <br />Cost associated with T&M work done on 101h Street. <br />In accordance too waterline design plans and specifications, Excel Paving marked, saw cut paving <br />and exposed existing utilities (marked & unmarked) throughout 101h and Bush St. Existing utility <br />elevations and alignments are in direct conflict with the new mainline design. The City provided <br />revised plans to Excel paving for a Cost proposal. Excel Paving provided a lump surn price of <br />$54,000.00 to complete the work in accordance to the revised plans. New issues surfaced, causing <br />additional plan revisions. Therefore, in order to keep the project moving, the City provided approval <br />for the contractor to proceed with the work on a time and material basis. Additional work was <br />completed 40 percent below original cost proposal. <br />FINAL COST: $31,472.54 <br />Page 1 of 2 <br />3,S <br />
The URL can be used to link to this page
Your browser does not support the video tag.