Laserfiche WebLink
Jeremy Ogulnick <br />May 5, 2020 <br />Page 7 <br />been prepared based on the utilization profile of each included land use component. The <br />following section calculates the parking requirements for Project based on the shared <br />parking methodology outlined in ULI Shared Parking, 2nd Edition. <br />The specific tenancy mix of the Project provides an opportunity to share parking spaces <br />based on the utilization profile of each included land use component. The parking ratios <br />identified above have been used directly for incorporation into a shared parking <br />analysis consistent with the methodology outlined in the Urban Land Institute (ULI) <br />and published in Shared Parking, 2nd Edition. Based on the results of this shared <br />parking assessment, the adequacy of the Project's retail/commercial component <br />parking supply of 400 spaces can be determined. <br />Key inputs in the shared parking analysis for each land use include: <br />• Peak parking demand by land use for visitors and employees. <br />■ Adjustments for alternative modes of transportation, if applicable. <br />• Adjustment for internal capture (captive versus non -captive parking demand), <br />if applicable. <br />• Hourly variations of parking demand. <br />■ Weekday versus weekend adjustment factors <br />• Monthly adjustment factors to account for variations of parking demand over <br />the year. <br />■ Applicable parking ratios per Article Xv— Off -Street Parking in the City of <br />Santa Ana Municipal Code <br />For this analysis, a conservative 5% parking adjustment was utilized to account for <br />"walk-in" trips attributable to synergy between uses and the residential component of <br />The Bowery and adjoining retail/commercial component. These adjustments are <br />representative of the interaction between the Project's uses. <br />Tables 2 and 3 present the overall weekday and weekend parking demand profiles for <br />the retail/commercial component of the Project based on the shared parking <br />methodology. Columns (1) through (3) of these tables present the parking accumulation <br />characteristics and parking demand of the proposed uses for the hours of 6:00 AM to <br />midnight. Columns (4) through (5) presents the expected joint -use parking demand for <br />the Center on an hourly basis and further presents the hourly parking surplus/deficiency <br />for the proposed Project compared to the parking supply of 400 spaces. <br />Review of Tables 2 and 3 indicates that the future full occupancy weekday peak <br />retail/commercial parking demands will occur at 12:00 PM with peak demands of 332 <br />spaces. Based on the proposed retail/commercial parking supply of 400 spaces, the <br />peak demand hours on a weekday will yield a surplus of 68 spaces. On a weekend <br />YW20f1\M2].I-ThPB.,,. ,Santa Ana\R,p,64274 The Bravery Revn.d P7r5G 1 89—Plan 0.505-21)20.doc <br />