Laserfiche WebLink
During the Construction phase of the Project, IMPLAN estimates that the direct, indirect, and induced impacts of <br />Project construction would support 4,454 jobs and generate over $795 million of total economic output for Orange <br />County, with 2,491 jobs and over $498 million in economic output occurring within the City of Santa Ana. <br />Employment and output estimates for construction offer insight into the cumulative economic impacts of construction <br />during the construction phase. For the construction phase, employment represents Full Time Equivalencies (FTE), <br />while for the operations phase, employment includes all wage and salary employees, as well as proprietors. (This is <br />the same methodology used by the BEA and BLS'.) Thus, construction impacts are one-time impacts, while ongoing <br />operations impacts can be interpreted as recurring annual impacts. <br />Table 18: Industrial Prototype Construction Economic Impacts <br />Estimated Economic Impact of Industrial Prototype Construction <br />City of Santa Ana <br />Impact <br />Employment <br />Labor Income <br />Value Added <br />Output <br />Direct <br />501 <br />$39,230,000 <br />$49,600,000 <br />$75,000,000 <br />Indirect <br />3 <br />$270,000 <br />$450,000 <br />$706,000 <br />Induced <br />1 <br />$60,000 <br />$118,000 <br />$185,000 <br />Total <br />506 <br />$39,560,000 <br />$50,100,000 <br />$76,000,000 <br />Rest of Orange <br />County <br />Impact <br />Employment <br />Labor Income <br />Value Added <br />Output <br />Direct <br />N/A <br />N/A <br />N/A <br />N/A <br />Indirect <br />49 <br />$3,900,000 <br />$6,500,000 <br />$10,000,000 <br />Induced <br />166 <br />$9,160,000 <br />$16,900,000 <br />$26,470,000 <br />Total <br />216 <br />$13,100,000 <br />$23,4000,000 <br />$36,500,000 <br />Total Countywide <br />722 <br />$52,600,000 <br />$73,500,000 <br />$112,500,000 <br />Note: Numbers are rounded and may not sum <br />Source: IMPLAN, AECOM <br />During the Construction phase of the Industrial Prototype, IMPLAN estimates that the direct, indirect, and induced <br />impacts of construction would support 722 jobs and generate over $112 million of total economic output for Orange <br />County, with 506 jobs and over $75 million in economic output occurring within the City of Santa Ana. <br />The economic output from the Construction phases would occur as a. one-time impact and does not represent the <br />generation of operational long-term income or employment. <br />3 Bureau of Labor Statistics employment definitions: https://vvvwv.bls.gov/cps/lfcharacteristics.htrn#emp <br />75C-650 <br />