Laserfiche WebLink
Jeremy Ogulnick <br />August 5, 2020 <br />Page 12 <br />Road. The adjoining land uses to Apex Laguna Niguel consist of mostly residential <br />uses, with commercial uses to the east. <br />Based on the above descriptions of six existing sites, locational and parking -related <br />characteristics are similar and comparable to the Project (i.e., not located in a <br />TOD/Transit-Oriented Development, with no off -site parking nearby, which can <br />reduce on -site parking needs), with their empirical parking demand ratios considered <br />to be indicative of the Project's potential parking needs. The Project will be <br />providing a supply of 2,200 spaces, which, when divided by 1,100 dwelling units, <br />corresponds to a parking supply ratio of 2.0 spaces per dwelling unit, inclusive of 163 <br />"car lift" spaces. This supply ratio is greater than the empirical ratios from the six <br />comparable sites most similar to the Project and helps validate adequacy of parking <br />for the Project. <br />Residential Component Parking Supply <br />Based on review of Table 1, parking for the residential component of the Project will <br />be primarily provided via structured parking, plus two (2) surface stalls. As shown, a <br />total of 1,918 "lst access" spaces will be provided, which will be supplemented by an <br />additional 117 "2°d access (tandem)" spaces provided within the Project's parking <br />structures, and 163 "car lift" spaces for a total supply of 2,200 stalls (1,918 + 2 + 117 <br />+ 163 = 2,200). The Project's proposed residential parking supply of 2,200 spaces <br />allows for the provisions one parking space per bedroom, which total 1,404 <br />bedrooms, with a remaining balance of 796 spaces that could be used to <br />accommodate residential guest parking demand and/or additional parking demand of <br />future residents. <br />Project Residential Parking Supply versus Demand <br />The bottom portion of Table 5 estimates the project's parking needs based on the <br />application of the average, 85d' percentile, and 95d' percentile parking rates from <br />comparable sites. For the 1,100 units as now proposed, it is estimated that the <br />average demand would be 1,518 spaces, the 85d' percentile demand would be 1,628 <br />spaces, and the 95d' percentile demand would be 1,771 spaces. Comparing the 95d' <br />percentile demand of 1,771 spaces against the proposed supply of 2,200 spaces yields <br />a surplus of 429 spaces. Given these results, we conclude that the proposed residential <br />parking supply of 2,200 spaces is more than adequate and will satisfy the Project's <br />residential parking demands. <br />To maintain adequate parking supply at all times, it is recommended that a Parking <br />Management Plan (PMP) be implemented to ensure parking is available for all users, <br />inclusive of determining, based on the actual needs of the Project, and when the use <br />of "car lifts" would be necessary in the future. <br />N'.\42=2204T14-The Bowery, Santa Ma ,.ftk274 The Wam RedhillR RedSANd029L,mat Plan 08-05-2020. doer <br />