My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - PH - THE BOWERY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
08/18/2020
>
75C - PH - THE BOWERY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 5:10:27 PM
Creation date
8/13/2020 4:53:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75C
Date
8/18/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1021
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 4 <br />CITY CODE PARKING REQUIREMENT AND COMPOSITE PARKING SUPPLY RATIOS3 <br />THE WARNER-REDHILL, SANTA ANA <br />No. Of <br />No. Of <br />City of Santa Ana Code Parking <br />Spaces <br />Land Use / Project Description <br />Units <br />Bedrooms <br />Requirement <br />Required <br />The Warner-Redhill Apartments <br />o No. of Units <br />1,100 <br />-- <br />1 space per unit <br />1,100 <br />o Studio Units <br />211 <br />211 <br />1 space per bedroom <br />211 <br />0 1 Bedroom Units <br />600 <br />600 <br />1 space per bedroom <br />600 <br />0 2 Bedroom Units <br />274 <br />548 <br />1 space per bedroom <br />548 <br />0 3 Bedroom Units <br />15 <br />45 <br />1 space per bedroom <br />45 <br />Total <br />1,100 <br />1,404 <br />2,504 <br />Guest parking <br />-- <br />-- <br />25% of total parking required <br />626 <br />(2,513 x 0.25) <br />A. Total Parking Code Requirement: <br />3,130 <br />B. Proposed Parking Supply — Constructed: <br />1,920 <br />C. Proposed 2°a Access (Tandem) Supply <br />117 <br />D. Proposed "Car Lift" Supply <br />163 <br />E. Total Proposed Parking Supply [Row B +Row C + Row D] <br />2,200 <br />F. Parking Surplus/Deficiency (+/-) [Row D — Row A] <br />-930 <br />G. Residential Use Code Composite Parking Demand Ratio (sp/du) [Row A +total DU] <br />2.85 <br />H. Project "Constructed" Parking Supply Ratio (sp/du) [Row B + total DU] <br />1.75 <br />I. Project Parking Supply Ratio with 2na Access Stall (sp/du) [(Row B + Row C) +total DU] <br />1.85 <br />J. Total Project Parking Supply Ratio (sp/du) [Row E =total DU] <br />2.0 <br />3 Source: City of Santa Ana Municipal Code, Section 41-]�/J��!CCZZ]7/�'�,1ltip fi(//aay�y�p111�lcn]Il�y] dwellings. <br />N'.\420N2204T14- The Bowery, Santa Mai ,Pr 4274The Wama Redhill RevRed 1Tk'T�SNd Pal kl anagemaR Plan 08-05-2020. dots <br />
The URL can be used to link to this page
Your browser does not support the video tag.