My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - PH - THE BOWERY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
08/18/2020
>
75C - PH - THE BOWERY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 5:10:27 PM
Creation date
8/13/2020 4:53:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75C
Date
8/18/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1021
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Bowery Mixed -Use Project 3. Revisions to the Draft EIR <br />3. Revisions to the Draft EIR <br />This section contains revisions to the Draft EIR based upon: (1) clarifications required to prepare a response <br />to a specific comment; and/or (2) typographical errors. The provision of these additional mitigation measures <br />does not alter any impact significance conclusions as disclosed in the Draft EIR. Changes made to the Draft <br />EIR are identified here in str keeut text to indicate deletions and in underlined text to signify additions. <br />3.1 Revisions in Response to Written Comments and City Changes to Text <br />The following text, organized by Draft EIR Chapters and Sections, has been revised in response to comments <br />received on the Draft EIR and corrections identified by the City. <br />Chapter 1.0, Executive Summ <br />The last row of Table 1-2 on Page 1-17, Section 1.0, Executive Summary, is revised as follows: <br />Impact LU-2: The Project <br />would not cause a significant <br />9 <br />environmental impact due to <br />a conflict with any land use <br />plan, policy, or regulation <br />adopted for the purpose of <br />avoiding or mitigating on <br />environmental effect. <br />Potential!) Less <br />than significant <br />g <br />Agreerent that is <br />Lessthan <br />significant <br />rettuirR—ter <br />- - be "-rfied <br />c^mac.... _ ^.- 1sleet <br />,is-pFe PeFly- S <br />__ __ __ _ _ _ <br />of an sielseft, <br />♦_ same _r ____ _-__. <br />subject the <br />y� , r lable is <br />None required <br />The third row of Table 1-2 on Page 1-18, Section 1.0, Executive Summary, is revised as follows: <br />Impact NO]-3: The Project <br />Rew,:e8y Less <br />Less than significanr <br />would not expose people <br />than significant <br />ebeve: <br />residing or working in the <br />Project area to excessive <br />noise levels. <br />None required <br />The last row of Table 1-2 on Page 1-20, Section 1.0, Executive Summary, is revised as follows: <br />Impact TR-1: The Project <br />Significant <br />Mitigation Measure TRA: Grand <br />Significant and <br />would conflict with a <br />Avenue/Warner Avenue (#4) (Santa Ana): <br />Unavoidable <br />program, plan, ordinance, <br />The Development Agreement that is required <br />or policy addressing the <br />for implementation of the proposed Project <br />circulation system, including <br />shall include a clause requiring payment of a <br />transit, roadway, bicycle, <br />fair share contribution to the improvement to <br />and pedestrian facilities. <br />add an eastbound protected right -turn <br />City of Santa Ana <br />Final EIR <br />April 2020 <br />3-1 <br />75C-964 <br />
The URL can be used to link to this page
Your browser does not support the video tag.