Laserfiche WebLink
Ms. Rebecca Davis <br />May 5, 2020 <br />Page 5 <br />overstating the number of lanes on several roadways could have consequences <br />for impact and mitigation needs. <br />Conclusion <br />This concludes my comments on the Bowery Mixed Use Project FEIR. Because <br />the DEIR improperly deducted trips for a prior use of the Project site that was not <br />present when the NOP was circulated nor when baseline traffic counts for the <br />analysis were taken, because it unreasonably treats 18,000 square feet of <br />unspecified retail commercial as a "shopping center" rather than a logical specific <br />use or range of uses that would occupy a retail floor area of this size and <br />because the analysis consistently makes assumptions most favorable to the <br />Project with regard to trip internalization and passer-by attraction, the FEIR <br />should not be certified, the traffic analysis should be redone and the <br />environmental document should be recirculated in "draft' status. <br />Sincerely, <br />Smith Engineering & Management <br />A California Corporation <br />,, ;; it e:."uiC/)e!I•s <br />o� <br />e ca No. 0938 � : m <br />C : EXP -37-zo <br />0 ` <br />/ OF CAi\F v"I <br />11............. uyt� <br />Daniel T. Smith Jr., P.E. <br />President <br />Attachment 1 <br />Resume of Daniel T. Smith Jr., P.E. <br />I RAI I [( • „i:%N 11 IR I A 110A, " .%,AN.AQIi"I N I. <br />5.)I I I <,w , R,md, Union City', C--A 91587 tel: S10.4S9.9477 Ins: SIC).-{89 L),475 <br />