My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2020-09-01
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
09/01/2020
>
FULL PACKET_2020-09-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2020 8:42:07 AM
Creation date
8/28/2020 8:53:17 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/1/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
560
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BEWLEY STREET TOWNHOMES PROJECT <br />Final Initial Study/Mitigated Negative Declaration <br />,A <br />Mitigation <br />Mitigation Measure <br />Implementation <br />Implementation <br />Monitoring <br />Monitoring <br />Verification Compliance <br />and/or unique resource (Public <br />Resources Code 21083.2(g)). <br />Construction activities can continue in <br />other areas. If the find is considered <br />an "archeological resource" the <br />archaeologist, in cooperation with <br />Native American Monitor(s) shall <br />pursue either protection in place or <br />recovery, salvage and treatment of the <br />deposits. Recovery, salvage, and <br />treatment protocols shall be developed <br />in accordance with applicable <br />provisions of Public Resource Code <br />Section 21083.2 and State CEQA <br />Guidelines 15064.5 and 15126.4. If a <br />tribal cultural resource cannot be <br />preserved in place or left in an <br />undisturbed state, recovery, salvage, <br />and treatment shall be required at the <br />project applicant's expense. All <br />recovered and salvaged resources <br />shall be prepared to the point of <br />identification and permanent <br />preservation in an established <br />accredited professional repository. <br />June 2020 4-8 Mitigation Monitoring and Reporting Program <br />75A-69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.