My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMTS FOR SUBSURFACE IMAGING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
09/15/2020
>
25D - AGMTS FOR SUBSURFACE IMAGING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 5:12:04 PM
Creation date
9/10/2020 4:44:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25D
Date
9/15/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rate Schedule <br />Subsurface Utility Engineering <br />Services <br />Pothole Under Natural Ground <br />(SUE) <br />Bill Rate <br />$600.00 <br />Services and <br />Overtime <br />$685.00 <br />Hourly <br />Prevailing <br />Wage <br />$685.00 <br />Rates <br />Prevailing <br />Wage . <br />$1,025.00 <br />Unit <br />per hole <br />Pothole Under Paving/Concrete <br />$700.00 <br />$805.00 <br />$855.00 <br />$1,365.00 <br />per hole <br />Pothole Exceeding 6.99 feet in Depth <br />$105.00 <br />$125.00 <br />$130.00 <br />$165.00 <br />per foot <br />Air -Vacuum Excavation Truck/Crew/Equipment <br />$335.00 <br />$395.00 <br />$425.00 <br />$510.00 <br />per hour <br />Utility Designating/Investigation Underground <br />$0.91 <br />$1.14 <br />$1.15 <br />$1.48 <br />perfoot <br />Utility Designating/Investigation Overhead <br />$0.45 <br />$0.58 <br />$0.581 <br />$0.74 <br />per foot <br />Utility Designating: 2-Man Crew/Equipment <br />$275.00 <br />$350.00 <br />$335.00 <br />$440.00 <br />per hour <br />Utility Designating 1-:Man Crew/Equipment <br />$195.00 <br />$220.00 <br />$210.00 <br />$260.00 <br />per hour <br />Concrete/Asphalt Coring <br />$165.00 <br />$205.00 <br />$205.00 <br />$225.00 <br />per hour <br />Survey: 2-Man Crew/Equipment <br />$255.00 <br />$345.00 <br />$260.00 <br />$350.00 <br />per hour <br />Survey: 1-Man Crew/Equipment <br />$180.00 <br />$225.00 <br />$185.00 <br />$230.00 <br />per hour <br />Senior Project Manager <br />$205.00 <br />N/A <br />N/A <br />N/A <br />1perhour <br />Project Engineer <br />$185.00 <br />N/A <br />N/A <br />N/A <br />per hour <br />Project Surveyor <br />$185.00 <br />N/A <br />N/A <br />N/A <br />per hour <br />Project Manager <br />$145.00 <br />N/A <br />N/A <br />N/A <br />per hour <br />SUE Manager <br />$125.00 <br />N/A <br />N/A <br />N/A <br />per hour <br />CADD Supervisor <br />$120.00 <br />N/A I <br />N/A <br />N/A <br />per hour <br />SUE Supervisor <br />$90.00 <br />$135.00 <br />$120.00 <br />$160.00 <br />per hour <br />SUE Technician III <br />$80.00 <br />$120.00 <br />$120.00 <br />$160.00 <br />per hour <br />SUE Technician II <br />$75.00 <br />$112.50 <br />$120.00 <br />$160.00 <br />per hour <br />SUE Technician 1 <br />$70.00 <br />$105.00 <br />$120.00 <br />$160.00 <br />per hour <br />CADD Technician <br />$85.00 <br />$127.50 <br />N/A I <br />N/A <br />per hour <br />Administrative Support <br />1 $75.00 <br />$112.50 <br />N/A <br />N/A <br />per hour <br />Mobilization: Air -Vacuum Excavation Truck/Crew <br />$4.32 <br />$5.68 <br />$5.77 <br />$7.50 <br />per mile <br />Mobilization: Designating/Survey Truck/Crew <br />Per Diem <br />1 $3.02 <br />$4.081 <br />I GSA rates <br />$4.261 <br />$5.74 <br />per mile <br />Encroachment and Traffic Permits <br />actual cost <br />Subcontractors <br />cost plus 10% <br />Miscellaneous Expenses <br />cost plus 10% <br />P OSAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.