My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT FOR STORMWATER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
10/20/2020
>
25F - AGMT FOR STORMWATER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2020 3:14:37 PM
Creation date
10/14/2020 3:01:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
10/20/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Los Angeles Laurel Canyon Boulevard Green Street Design -Build This project <br />received awards from the ASCE Los Angeles Section, ASCE Metropolitan Los Angeles Branch, <br />and CASQA. Principal -in -Charge for the design of bioswales along 1,000 linear feet of Laurel <br />Canyon Boulevard for LA Sanitation — City of Los Angeles and the Los Angeles Conservation <br />Corps. The project provided increased groundwater recharge, reduced flooding impacts, <br />protected compatible beneficial uses, and improved the neighborhood quality of life. This was <br />accomplished by the design of a series of infiltration swales along Laurel Canyon Boulevard <br />between Kagel Canyon Street and Terra Bella Street with curb, gutter, and sidewalk <br />improvements. This project collected stormwater runoff from a 125-acre drainage area. Duties <br />included developing design and traffic control plans and performing construction management. <br />City of Los Angeles Garvanza Park Rainwater Capture and Use This project received the <br />prestigious CASQA Outstanding Stormwater BMP Implementation Project Award. Principal <br />Engineer responsible for assisting LA Sanitation — City of Los Angeles and North East Trees to <br />determine the feasibility of retrofitting Garvanza Park with regional stormwater management <br />BMPs to enhance urban and stormwater runoff water quality from an 85-acre watershed for <br />TMDL compliance. Designed a drainage system to route runoff from an existing 48-inch RCP <br />storm drain into a pretreatment BMP system consisting of a hydrodynamic separator and <br />settling basin, one water tight subsurface detention gallery, and one subsurface -infiltration <br />gallery for onsite landscape irrigation use and infiltration. Designed the pump station with <br />SCADA and inline monitoring systems. Delineated and characterized the tributary watershed to <br />conduct a hydrologic and hydraulic analysis, and performed a pollutant load removal analysis <br />for the proposed structural treatment controls. Performed tasks involving utility research, <br />topographic ground surveying, potholing, a geotechnical analysis, including onsite infiltration <br />testing, and shoring analysis. Delivered PS&E construction documents and assisted with the <br />bid process. Performed construction administration duties, including construction inspection <br />and material testing. Performed post -construction water quality monitoring to assess BMP <br />function and effectiveness, which proved the project is showing tangible results in terms of <br />TMDL compliance. Worked with stakeholders to identify concerns prior to and during <br />construction. <br />City of Beverly Hills Burton Way Median Green Street Principal -in -Charge for a feasibility <br />study and the design of bioswales and green street improvements to capture and retain urban <br />runoff on the Burton Way median in the City of Beverly Hills. These improvements will assist <br />the City in complying with the Ballona Creek Watershed EWMP and the Ballona Creek Metals <br />TMDL. The project includes aesthetic improvements with efficient landscape design, including <br />drought -tolerant plants that reduce outdoor irrigation use and help the City meet water <br />conservation objectives. The multi -benefit design incorporates walking trails, including public art <br />displays and an aesthetically pleasing landscape. The project will enhance water quality, <br />reduce flooding impacts, and provide a beautiful, tranquil community space that increases public <br />awareness of stormwater quality and water conservation issues. <br />25F-152 <br />
The URL can be used to link to this page
Your browser does not support the video tag.