Laserfiche WebLink
lrerracon <br />2020 Schedule of Services and Fees <br />Southern California <br />1.PERSONNEL <br />Senior Principal / Office Manager <br />$ 185.00 /hour <br />Principal <br />$ 175.00/hour <br />Senior Engineer/Geologist <br />$ 165.00 /hour <br />Senior Project Manager <br />$ 155.00 /hour <br />Project Engineer/Geologist <br />$ 145.00 /hour <br />Project Manager <br />$ 135.00 /hour <br />Senior Staff Engineer/Geologist <br />$ 125.00/hour <br />Staff Engineer/Geologist <br />$ 105.00 /hour <br />Field Engineer/Geologist <br />$ 95.00 /hour <br />Soil Technician 1 <br />$ 68.00 /hour <br />Soil Technician 11 <br />$ 75.00/hour <br />Asphalt Field Technician <br />$ 75.00 /hour <br />Special Inspector -Concrete and Masonry <br />$ 75.00 /hour <br />Special Inspector -Steel, Fire Proofing and CWI Welding <br />$ 85.00/hour <br />Administration <br />$ 68.00 /hour <br />Computer Data Entry <br />$ 75.00 /hour <br />Asphalt / Soil Technician 1-11(Prevailing Wage) <br />$ 98.00 /hour' <br />Special Inspector (Prevailing Wage) <br />$ 105.00/hour' <br />NOTE: Deposition or court testimony at 1.5 times regular rate, with a minimum of $160.00 per hour with payment due at the time of service. <br />1- Increase hourly rate by 1.6 for weekend, night and holiday work and 4 hour minimum. Travel time is portal to portal. <br />2. EXPENSES AND SUPPLIES <br />Vehicle Charge (mileage) <br />$ 0.65 /mile <br />Per Diem <br />$ 150.00 / day <br />Photo Ionization Device (PID) <br />$ 100.00 /day <br />Miscellaneous Charges (equipment, materials, etc.) <br />COST +15% <br />Visual -Manual Engineering Classification <br />$ 10.00 /test <br />In -situ Moisture and Density <br />$ 15.00 /test, <br />In -situ Moisture <br />$ 5.00 /test <br />Specific Gravity <br />$ 80.00 /test <br />Atterberg limits (liquid and plastic limits) ASTM <br />$ 80.00 /test <br />Atterberg limits (liquid and plastic limits) COE <br />$ 105.00 /test <br />Shrinkage Limit <br />$ 60.00 /test <br />Sieve Analysis (Fine Sieve + wash) <br />$ 120.00 /test <br />Sieve and Hydrometer Analysis <br />$ 200.00 /test <br /># 200 Wash <br />$ 40.00 /test <br />Hydrometer Only <br />$ 125.00/test <br />Organic Content <br />$ 65.00 /test <br />Sand Equivalent <br />$ 120.00 /test <br />Maximum Density (Standard 4-inch) <br />$ 135.00 /test <br />Maximum Density (Modified 4-inch) <br />$ 180.00 /test <br />Maximum Density (Standard 6-inch) <br />$ 180.00 /test <br />Maximum Density (Modified 6-inch) <br />$ 180.00/test <br />Maximum Density (CA 216) <br />$ 155.00 /test <br />Direct Shear (in -situ) <br />$ 220.00 / test, <br />Direct Shear (remolded) <br />$ 250.00 / test <br />Unconfined Compression <br />$ 100.00 / test, <br />Triaxial Shear <br />On request / test, <br />Consolidation (without time rate) <br />$ 165.00 / testa <br />Consolidation (with time rate - Per load increment) <br />$ 60.00 / load increment, <br />Swell test <br />$ 80.00 / test, <br />Page 1 of 2 <br />25F-192 <br />