My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT FOR STORMWATER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
10/20/2020
>
25F - AGMT FOR STORMWATER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2020 3:14:37 PM
Creation date
10/14/2020 3:01:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
10/20/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rupee Malhotra <br />PE, QSD, LEEP AP <br />Project Planning/Feasibility Studies <br />Education <br />• MS and BS, Civil Engineering <br />Registrations/Certifications <br />• Professional Engineer#78574, CA <br />• QSD #23276 <br />• LEED AP Building Design + Construction <br />#11267844 <br />Why select <br />Proven expertise in design and peer review <br />of stormwater treatment measures and <br />erosion and sediment control measures for <br />NPDES permit compliance <br />• Expansive experience driving projects from <br />concept/feasibility level through detailed <br />design and PS&E <br />• Proven record of quality and delivery <br />Denotes projects completed with other firms <br />Rupeet is a Civil & Water Resources Professional Engineer licensed <br />in California with more than 15 years of progressive experience <br />in t, floodplain management, stormwater management & design, <br />project management, NPDES permit compliance, drainage design, <br />SWPPP development, erosion & sediment control design, and scour <br />countermeasures analysis and design. Rupeet has considerable <br />experience in developing SWPPP documents for construction <br />sites and industrial facilities pursuant to the requirements of <br />the Construction General Permit and Industrial General Permit, <br />respectively, and has been providing SWPPP development/review <br />and BMP services to private and public sector clients in Northern <br />California for over 10 years. Rupeet is also an experienced third -party <br />reviewer of stormwater management plans for new development and <br />redevelopment and has assisted Bay Area engineering firms and <br />developer clients with the review of their SWMP designs to meet the <br />San Francisco Bay Area MRP Provision C.3 requirements. <br />Fairgrounds Water Drainage Improvements Feasibility Study- <br />Stormwater Resource Plan Implementation El Dorado County <br />Water Management Agency, El Dorado County, CA <br />Rupeet is the lead engineer responsible for developing the feasibility <br />study for use of stormwater as a resource at the El Dorado County <br />Fairgrounds property. The project was identified in the El Dorado <br />County Water Agency Stormwater Resource Plan and will alleviate <br />localized flooding conditions and enable continued, reliable use of the <br />fairgrounds. <br />Green Infrastructure On -Call Services — Educational Curriculum <br />Development San Francisco Public Utilities Commission <br />As a long-term client, San Francisco Public Utilities Commission <br />has tasked Stantec with the development of training curriculum for <br />inspection and maintenance of green infrastructure BMPs owned and/ <br />or maintained by SFPUC. The training curriculum is being developed <br />for construction, maintenance and inspection crew to provide green <br />infrastructure C&M guidance. Rupeet's role is to provide oversight on <br />the development of cumculum modules and advance the curriculum <br />development. <br />Stormwater Management Memorandum; South County Regional <br />Water Authority (SCRWA) New Maintenance Facility, Gilroy, CA <br />Rupeet was the senior engineer on the Stormwater Management <br />Design for the SCRWA New Maintenance Facility Building. The <br />m 25F-250 <br />Starnes •Proposal for On Call Stormwater Project Design Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.