Laserfiche WebLink
Professional Staff <br />Principal Engineer/Geologist/Environmental Scientist/Certified Industrial Hygienist <br />_ $ <br />195 <br />Senior Engineer/Geologist/Environmental Scientist.. _.___..........__..........__ <br />$ <br />190 <br />Senior Project Engineer/Geologist/Environmental Scientist _.____.___.___.___.__ <br />$ <br />185 <br />Project Engineer/Geologist/Environmental Scientist.... .___.. _.__. _._... <br />____.___._ $ <br />175 <br />Senior Staff Engineer/Geologist/Environmental Scientist _.___ _.__. _.__. <br />__.___.___ $ <br />150 <br />Staff Engineer/Geologist/Environmental Scientist. _. __. _..... _. <br />__.__.....__ $ <br />145 <br />GIS Analyst _.... _.. <br />_. __. $ <br />125 <br />Technical Illustrator/CAD Operator _._ _._ __.. _.. <br />$ <br />103 <br />Field Staff <br />Certified Asbestos/Lead Technician <br />Field Operafions Manager <br />Nondestructive Examination Technician (UT, MT, LP) <br />Supervisory Technician __..... <br />Special Inspector (Concrete, Masonry, Structural Steel, Welding, and Fireproofing). <br />Senior Technician __.__ _...... __.... __.... <br />Tcrhniri.n <br />$ 185 <br />$ 125 <br />$ 119 <br />$ 115 <br />$ 109 <br />$ 108 <br />$ 103 <br />Administrative Staff <br />Information Specialist __ ......... ... ....__. .. __.__.....__ $ 85 <br />Geotechnical/Environmental/Laboratory Assistant ...... ........ ......... ....... ................. $ 80 <br />Data Processor ........ .......... ....... ....... ................. $ 75 <br />Concrete Coring Equipment (includes technician) ............ ............. ........... ......... <br />Anchor Load Test Equipment (includes technician) ......... ......... .......... ..... <br />GPR Equipment <br />Inclinometer <br />Hand Auger Equipment <br />Rebar Locator (Pachometer) <br />Vapor Emission Kit <br />Nuclear Density Gauge <br />X-Ray Fluorescence <br />PI D/FID _...... <br />Air Sampling Pump <br />Field Vehicle. <br />Expert Witness Testimony <br />Direct Expenses ...._.. __.... ....___. __....... .................... <br />Special equipment charges will be provided upon request. <br />$ 190/hr <br />.._. $ 190/hr <br />$ 180/hr <br />$ 100/hr <br />$ 80/hr <br />$ 25/hr <br />$ 65/kit <br />$ 121hr <br />$ 70/hr <br />$ 25/hr <br />$ 10/hr <br />$ 15/hr <br />$ 450/hr <br />Cost plus 15 % <br />For field and laboratory technicians and special inspectors, overtime rates at 1.5 times the regular rates will be charged <br />for work performed in excess of 8 hours in one day Monday through Friday and all day on Saturday. Rates at twice the <br />regular rates will be charged for all work in excess of 12 hours in one day, all day Sunday and on holidays. <br />Field technician and special inspection hours are charged at a 4-hour minimum, and 8-hour minimum for hours exceeding <br />4 hours. <br />Invoices are payable upon receipt. A service charge of 1.5 percent per month may be charged on accounts not paid <br />within 30 days. <br />Our rates will be adjusted in conjunction with the increase in the Prevailing Wage Determination during the life of the <br />project, as applicable. <br />The terms and conditions are included in Ninyo & Moore's Work Authorization and Agreement form. <br />Ninyo&Moore I Santa Ana Stormwater Project Design I SO4-02926 I August 12, 2020 <br />CAI <br />5 Stantec 25F-272 Starnes • Proposal for OrrCall Smrmwater Project Design Services <br />