My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT FOR STORMWATER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
10/20/2020
>
25F - AGMT FOR STORMWATER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2020 3:14:37 PM
Creation date
10/14/2020 3:01:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
10/20/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXPERIENCE <br />Culver Blvd. Stormwater Filtration and Retention <br />Culver, CA <br />This project will maximize pollutant and stormwater capture by diverting <br />dry -weather and wet -weather stormwater flows at a rate of up to 50 cubic - <br />feet -per -second from two stormwater facility locations; a 66-inch reinforced <br />concrete pipe located at Harter Avenue and an 87-inch reinforced concrete <br />arch pipe located at Sepulveda Boulevard. Diverted stormwater flows are <br />first sent to one of two pretreatment units to remove trash and sediments <br />and then to a concrete underground storage facility capable of providing <br />up to 8-acre-feet of storage. Stored water is pumped to the post -storage <br />filtration system where it is polished for final pollutant removal before being <br />returned to downstream storm drain channels and receiving waters. As <br />an added benefit of this project, treated stormwater will be used to offset <br />potable water irrigation demands on the newly constructed 58-ft wide <br />raised landscape median and at nearby Veterans Park. <br />To reach a consensus with the residents for both projects, Tetra Tech <br />prepared a comprehensive Outreach Community Engagement Plan, <br />coordinated with the Citizens Advisory Committee, and participated in <br />community outreach meetings to encourage full and early community/ <br />stakeholder participation in the project. <br />Tetra Tech has completed the final design (PS&E) for these projects <br />and will continue to provide engineering support during construction. <br />Construction on this project occurred during late summer of 2019 and is <br />anticipated to be completed by the end of 2020. <br />City of Santa Ana 25F-38 TETRA TECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.