Laserfiche WebLink
Chris Jansen, PE, LEED GA <br />Cost Estimating <br />Mr. Jansen is a civil engineer whose work primarily consists of <br />stormwater-related projects. His design experience includes utility <br />research, post -construction stormwater Best Management Practices, <br />storm drain improvements and pump station design, hydraulic and <br />hydrologic modeling and design, stormwater capture and use water <br />quality compliance in Los Angeles County, roadway geometrics, <br />construction plan set production, preparation of project specifications, <br />cost estimating, and technical memorandum and report writing. His <br />experience with construction support includes responding to RFls, <br />reviewing shop drawings, and attending construction meetings. <br />Mr. Jansen has comprehensive knowledge in the use of Autodesk's <br />Civil 3D software for both conceptual and detailed design studies, as <br />well as the production of construction plan sets. Mr. Jansen also has <br />experience using the following computer software: ArcGIS, QGIS, <br />EPANET, FlowMaster, HEC-HMS, HEC-RAS, HEC-SSP, HydroCalc, <br />HY-8, WinTR-55, WSPG, XPSWMM, MATLAB, VBA, and Microsoft <br />Office (Excel, PowerPoint, and Word). <br />Culver Boulevard Stormwater Infiltration and Retention Project, <br />City of Culver City, CA. Design Engineer. Provides pump station <br />design support for this multi -beneficial stormwater regional project. Tetra <br />Tech is selected by the City of Culver City to provide design services <br />to incorporate an infiltration gallery under a newly reconstructed raised <br />median along Culver Boulevard. The project also includes retention <br />basins to reuse captured stormwater runoff and urban runoff to irrigate <br />local landscape medians within the project area. The overall landscape <br />design of this project includes green elements such as bioswales along <br />the raised median and adjacent roadways to further promote stormwater <br />pollution prevention education. <br />Bellflower Water Capture Project at Caruthers Park Stormwater <br />and Urban Runoff Capture Project, City of Bellflower, CA. Lead <br />Designer. Design services in the areas of general civil, pipeline <br />hydraulics, pipeline plan and profiles, and landscape irrigation and <br />planting plans. Provides construction support services by responding to <br />RFls, reviewing shop drawings, conducting water treatment equipment <br />inspections, and attending weekly construction meetings. Tetra Tech <br />is contracted to provide pre -design, design, and construction support <br />services for this Caltrans funded stormwater capture project. Tetra <br />Tech is providing a Project Engineering Study Report that includes <br />all necessary analyses to provide a recommendation for regional <br />"� I <br />TETRA TECH <br />