Laserfiche WebLink
0 <br />Alondra Park Project, Redondo Beach. Project Engineer in charge of the geotechnical design of an <br />underground stormwater and infiltration facility at the site. In addition, the feasibility of using injection <br />well at the site is being studied. <br />Clean Beaches, City of Santa Monica. Project Engineer in charge of the geotechnical design of two <br />underground stormwater storage tanks with their associated conveyance systems. Other tasks included <br />the design of the shoring and dewatering system for the site and performing CQA operations at the site <br />during installation of the shoring, and excavation. <br />Caruthers Park, City of Bellflower. Project Engineer in charge of the infiltration testing using large <br />diameter boreholes and geotechnical exploration for the design of large stormwater infiltration and <br />storage underground vaults, including foundation design for diversion structures, pump stations, and <br />pretreatment units. <br />URP Pit No. 2, Irwindale. Project Engineer in charge of the reclamation of the U PR Pit No. 2, <br />performing stability evaluations of the mining walls and backfill slopes, establishing compliance of the <br />filling process with the approved Fill Operations Plan. <br />URP Olive Pit, Irwindale. Project Engineer in charge of the design of the access road to provide <br />access to the reclamation of the pit. The access road was designed as a reinforced slope with multiple <br />layers of geogrids to minimize footprint and maximize available mining area. <br />LA River Watershed Management Program, Gateway Cities. Project Engineer in charge of the <br />infiltration assessment of different locations for the design of capture and infiltration BMP facilities within <br />the LA River watershed. <br />Port of Long Beach, Long Beach, CA. Project Engineer entrusted with the design of pile foundations <br />for Pier 300. Challenges included design of the pier considering the possibility of surface fault rupture. <br />US Corps of Engineers (USACE), USA. Project Engineer in charge of performing certification <br />inspections for different levee projects, dams, retarding basins, spreading basins, throughout Orange <br />County and LA County. Evaluating the stability and performance of levees and dams under different <br />hydraulic loadings and seismic conditions. <br />USA Air Force, Long Range Discrimination Radar Station Design Review. Project Engineer in <br />charge of reviewing the foundation design and seismic performance of a long-range discrimination <br />radar station in Alaska. <br />Space Rocket Launch Facilities, Georgia. Project Engineer in charge of the evaluation of the effect <br />of vibrations induced by space rocket launching on nearby facilities. <br />Arroyo Chico Channel, Tucson, Arizona. Project Engineer in charge of the geotechnical design <br />of channel improvements including a new U channel formed with side retaining walls and an open <br />soft bottom. The design included provisions for installation of a special shoring system near existing <br />buildings. Design was in conformance with USACE design guidelines. <br />City of Santa Ana 2 <br />