Laserfiche WebLink
Mike Olsen, PE <br />Structural Design <br />Mr. Olsen has been a part of the Tetra Tech team for nine years and <br />contributes his extensive structural engineering knowledge from his <br />involvement in municipal, industrial and federal projects. He has <br />completed a variety of projects varying in size and funding for both <br />public and private entities. Mr. Olsen's experience includes design, <br />analysis, detailing and construction in structural engineering. He <br />is knowledgeable in reinforced concrete, pre- and posttensioned <br />concrete, reinforced masonry, steel and timber construction for a <br />variety of building and infrastructure projects including reservoirs, <br />water/wastewater treatment facilities, pump stations, bridge, buried <br />concrete vaults, pipeline structures, bridges, as well as seismic retrofit <br />of existing structures. Mr. Olsen has extensive working knowledge <br />of the California Building Code (CBC), International Building Code <br />(IBC) and their application to civil and structural engineering projects. <br />Mr. Olsen is experienced with a variety of design software programs <br />including RISA-31D, RISA Foundation, RISA Floor, ENERCALC SEL, <br />L-PILE, Retain Pro and Hilti PROFIS Anchor. <br />Bolivar Park Stormwater and Runoff Capture Project, City of <br />Lakewood, Lakewood, CA. Structural Design Engineer. Providing <br />design phase services including plans, specifications and estimates. <br />Tetra Tech was contracted to evaluate the potential site location and <br />develop this stormwater runoff and capture project. The project consists <br />of an air -inflated rubber dam diversion system to re -direct all urban <br />runoff and stormwater runoff from the Del Arno channel through a pre- <br />treatment system to remove trash, debris, and sediment. A pump station <br />and drainage pipeline will convey the water into a large, buried multi- <br />chambered storage/infiltration facility. The stormwater collected in the <br />underground reservoir will be treated and used to irrigate the park's <br />landscaped areas. The system will monitor the weather conditions and <br />the facility through a secured cloud -based system. The underground <br />storage system is 2.8 million gallons (8.7 ac-ft). The goal of the project <br />is to not only help the City comply with the metals Total Maximum Daily <br />Loads (TMDLs), as presented in the Los Cerritos Channel Watershed <br />Management Program, but also provide additional benefits, such as <br />revitalized park infrastructure and augmentation of local water supplies. <br />Santa Monica Clean Beaches Initiative for Pier and Pico-Kenter <br />Basins, City of Santa Monica, Public Works Department, Santa <br />Monica, CA. Structural Design Lead. Responsible for the design of <br />the site improvements, diversion structure, pretreatment, underground <br />storage reservoirs, and piping systems. The project objective is to <br />TETRA TECH <br />