Laserfiche WebLink
Mike Nguyen <br />Mike Nguyen has 13 years of civil engineering experience <br />involving design, public works construction, and land <br />development projects. His recent experience includes <br />managing capital improvement projects, as well as PS&E <br />and traffic control plan preparation for public works projects, <br />including parking lot, street, water supply, park, and median <br />improvement projects. Mike also provides design for grading <br />and drainage; street and highway design, LID, geometric <br />layout, and pavement rehabilitation. <br />RELEVANT EXPERIENCE <br />Years of Experience <br />13 <br />Education <br />BS, Civil Engineering, 2005, <br />California State Polytechnic <br />University, Pomona <br />City of Bell Gardens John Anson Ford Infiltration Cistern Project to Capture Urban Runoff <br />Project Engineer for developing design PS&Es for this urban runoff capture project. John <br />Anson Ford Park is located in the City of Bell Gardens and the project will help the City and the <br />Lower Los Angeles River Upper Reach 2 Watershed Management Group meet its NPDES MS4 <br />Discharge requirements. The project will capture dry weather and storm runoff from a highly <br />industrialized urban catchment area of 2,295 acres. The project is anticipated to provide <br />compliance with existing water quality objectives for the entire Rio Hondo watershed portion of <br />the LAR UR2 WMA. Tasks include: a geotechnical field analysis, utility search, hydrologic and <br />hydraulic analysis, topographic mapping, preparation of design plans, construction <br />specifications, and engineering cost estimates. <br />City of Torrance Stormwater Basin and Treatment Wetlands Enhancement This project <br />received awards from the American Public Works Association (APWA), American Society of <br />Civil Engineers (ASCE), Engineering News -Record (ENR), California Stormwater Quality <br />Association (CASQA), and Storm Water Solutions magazine. Project Engineer for the design of <br />two treatment wetlands and two infiltration basins to retain, treat, and infiltrate stormwater <br />runoff. This project helps the City comply with the Santa Monica Bay Beaches Bacteria TMDL <br />requirements. Designed two 10-inch and one 14-inch pressured storm drain lines. Performed a <br />wetlands sustainability analysis to evaluate dry -weather inflows, evaporation, <br />evapotranspiration, and infiltration and ensure the long-term functionality of the wetlands <br />system. Conducted a hydrologic analysis using MODRAT in WMS to evaluate the reservoir <br />routing and pumping from the interconnected wetlands/detention basin system under Capital <br />Flood and SUSMP conditions. Conducted public outreach to gain input from the nearby <br />community and residents. Designed construction documents for the proposed improvements, <br />including site grading, roadway paving, recycled water line, and piping plans; retaining walls; <br />park lighting and signage; stream channel and infiltration basin design; trails, viewing areas, and <br />landscaping details; a water -tight system for irrigation; inlet and outlet structures; bridge <br />