Laserfiche WebLink
DocuSign Envelope ID: 994D71304-AOEO.44e9•I3853-2D49ACC73F7A <br />SIEMDNS <br />I tn�zvuify forG'� <br />• Siemens shall provide all software, hardware, equipment, tools, licensing and professional services per <br />this SOW. <br />• Siemens shall provide a project manager, engineer and field specialist for installation and <br />commissioning of described systems, <br />• Siemens shall provide ail programming and commissioning of systems intothe City's Milestone <br />Xprotect System. <br />• Siemens shall he responsible for all storage and computing calculations and programming of <br />communication routers/switches in conjunction with City IT. , <br />• All equipment shall be provided with a one-year equipment and workmanship warranty, <br />• Siemens shall furnish and Install twentyfive (25) fixed and multisensor cameras across the City Yard, <br />Milestone Xprotect camera licenses (25) and support program enrollment shall be included. Cameras <br />shall be Installed per the provided schedule of protection map and referenced matrix, <br />• Siemens shall be responsible for all mounting materials, including pedestal, parapet and corner style, <br />per the drawings and field requirements, <br />• Siemens shall provide all conduit and cable Installation required for described protection plan. <br />• Siemens shall provide and Install wireless radios for communication between buildings. Where <br />existing fiber shall be utilized, Siemens shall provide media converters, copper cabling shall be <br />provided from cameras to 11317, switches, media converters and radios, as required. <br />• Siemens shall utilize all existing, network switches where available for connection to CoSA network. <br />Siemens shall provide new communication and provide local network, as required for operational <br />system. <br />• Siemens shall install HP servers and storage for380days of camera data archival, Storage and servers <br />shall be installed In existing 19" vertical rack enclosures in operations center. <br />• Training shall be provided for up to 4 persons In a single training session. Not to Exceed 4 hours for <br />single session. <br />• Siemens engineering documentation shall include site plan and project riser diagram, <br />• Siemens assumes normal business hours Installation, <br />• Siemens assumes local 110v power shall be utilized for installation of new devices, <br />• Siemens assumes existing conduits to front gate shall be utilized and available. Siemens excludes new <br />trenching for any part of described scope. <br />