My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SIEMENS, INC (4)
Clerk
>
Contracts / Agreements
>
S
>
SIEMENS, INC (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 9:47:38 AM
Creation date
11/5/2020 8:15:32 AM
Metadata
Fields
Template:
Contracts
Company Name
SIEMENS, INC
Contract #
A-2020-202
Agency
Police
Council Approval Date
10/20/2020
Expiration Date
10/31/2023
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 994D7Be4-A6E8.44D8-n863-2D49ACC73F7A <br />SIEMENS <br />�t1�kauifi� -ForCi fe <br />,, I FNMMWRRM::=�� <br />• Siemens shall provide all software, hardware, licensing and professional services per this SOW. <br />• Siemens shall provide a project manager, engineer and field specialist for installation and <br />commissioning of described systems. <br />• Slemens shall provide all programming and commissioning of systems into the city's Milestone <br />Xprotect System. <br />• Siemens shall be responsible for all storage and computing calculations and programming of <br />communication routers/switches In conjunction with City IT. <br />• All equipment shall be provided with a one-year equipment and workmanship warranty. <br />• Siemens shall remove the existing OnSSI Occularis video management system and replace with <br />Mlletone Xprotect. All licenses 09) shall be provided with software maintenance pro -rated to renew <br />with CoSA city-wide system. <br />• Siemens shall provide one (1) client workstatlon and monitor (23") for programming, administration <br />and monitoring of SARTC cameras in operations office. Large format monitor to remain and be <br />connected to. <br />• Siemens shall utilize all existing network switches and assumes all cameras, switches, UPS, midspans <br />and cabling Infrastructure is in good working order. <br />• Siemens shall provide optional per camera replacement costs as optional for CoSA consideration. <br />• Siemens shall Install HP servers and storage for380days of camera data archival. Storage and servers <br />shall be Installed in existing 19" vertical rack enclosures in data center. <br />• Training shall be provided for up to 4 persons in a single training session, Not to Exceed 4 hours for <br />single session, <br />• Siemens excludes site plans and drawings. <br />• Siemens excludes repair of non-functioning cameras with base bid. <br />• Option: Single Mlnldome (Hanwha QNV-7080R) excludes extenders, cabling or media converters. <br />Camera includes wall mount, labor, mist, shipping and tax. <br />Materials, Equf meet and Software: <br />Project Management: <br />$ <br />4,800.Oo <br />Engineering and Installation: <br />$ <br />14,OD0,00 <br />Miscelllaneous, Shipping, Warranty: <br />$ <br />2,615,38 <br />California Taxi <br />$ <br />3,661.54 <br />Total: $ . 77,384.62 <br />Option: Single Minidome Camera <br />ReplacementIncludescamera labor(ea) $ 1,115.38 <br />SARTCSecurity Upgrades: ......................................................................................... $77,384.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.