My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1 - AA19-03;CUP19-21_813 N EUCLID STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
02-10-20
>
1 - AA19-03;CUP19-21_813 N EUCLID STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 9:20:06 PM
Creation date
11/9/2020 9:19:49 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution No. 2020-xx <br />Page 6 of 9 <br />EXHIBIT A <br /> <br />Conditions of Approval for Conditional Use Permit No. 2019-21 <br /> <br />Conditional Use Permit No. 2019-21 for after-hours operations is approved subject to <br />compliance, to the reasonable satisfaction of the Planning Manager, with applicable <br />sections of the Santa Ana Municipal Code, the California Administrative Code, the <br />California Building Standards Code, and all other applicable regulations. In addition, the <br />Applicant shall meet the following conditions of approval: <br /> <br />The Applicant must comply with each and every condition listed below prior to exercising <br />the rights conferred by this conditional use permit. <br /> <br />The Applicant must remain in compliance with all conditions listed below throughout the <br />life of the conditional use permit. Failure to comply with each and every condition may <br />result in the revocation of the conditional use permit. <br /> <br />1. All proposed site improvements must conform to Development Project Review (DP) <br />No. 2018-08 and the staff report exhibits. <br /> <br />2. Any amendment to this conditional use permit must be submitted to the Planning <br />Division for review. At that time, staff will determine if administrative relief is <br />available or if the conditional use permit must be amended. <br /> <br />3. Prior to the issuance of a building permit, a full landscape and irrigation plan is to be <br />submitted for review and approval. The landscape plan shall conform to the <br />commercial landscape standards, Citywide Design Guidelines, and the City’s Water <br />Efficient Landscape Ordinance. All utilities shall be properly screened, and the <br />proposed trash enclosure shall be screened by a four (4) foot high landscape <br />hedge and incorporate vines. The plan shall also incorporate a row of Italian <br />cypress trees, or similar species to be planted along the southern perimeter of the <br />property to provide additional screening to the residential uses to the south <br />(Modified by staff on February 10, 2020). <br /> <br />4. Prior to issuance of a building permit for the structures, the existing perimeter wall <br />shall be increased to seven feet in height. (Added by staff on February 10, 2020). <br /> <br />5. All existing and new perimeter walls shall be painted or coated in anti-graffiti <br />coating, and vines shall be planted along all such walls. <br /> <br />6. To deter loitering and illegal dumping, the landscape plan shall include dense <br />landscaping and a minimum five (5) foot tall wrought iron fence at the southeast <br />corner of the subject site between the southerly edge of the building and the <br />southern property line. <br /> <br />7. The location of the trash enclosure and the air/water machine must be designed to <br />minimize any potential impacts to the residential uses to the south of the subject
The URL can be used to link to this page
Your browser does not support the video tag.