Laserfiche WebLink
O NE B RO A D WA Y P LA Z A P RO J E CT E I R A D DE N DU M CI T Y O F S A NT A A NA <br />5. Environmental Analysis <br />March 2020 Page 75 <br />5.15 PUBLIC SERVICES <br />5.15.1 Summary of Previous Environmental Analysis <br />According to the Certified EIR, the Approved Project would create additional demand for police services and <br />fire and/or emergency rescue services. Additionally, the Approved Project would be expected to lead to new <br />school-aged students. The Certified EIR determined that the Approved Project would not impact library <br />services. Potential impacts would be reduced to less than significant levels through implementation of identified <br />mitigation measures. <br />The Approved Project’s impact to parks was discussed in the Initial Study to the Certified EIR under the <br />Recreation topic. The Initial Study determined that implementation of the Approved Project would not <br />significantly increase the use of area parks or lead to substantial physical deterioration of these recreation <br />resources. The Approved Project’s impact on parks and recreational facilities was determined to be less than <br />significant. <br />5.15.2 Impacts Associated with the Proposed Project <br />Would the Proposed Project result in substantial adverse physical impacts associated with the provision of new <br />or physically altered governmental facilities, need for new or physically altered gover nmental facilities, the <br />construction of which could cause significant environmental impacts, in order to maintain acceptable service <br />ratios, response times, or other performance objectives for any of the public services: <br /> <br />Environmental Issues <br />Substantial Change in Project Requiring <br />Major EIR Revisions <br />Substantial <br />Change in Circum-stances Requiring <br />Major EIR Revisions <br />New Information Showing New or Increased <br />Significant Effects <br />Less Than Significant Impact/No <br />Changes or New Information Requiring <br />Preparation of an EIR No Impact <br />a) Fire protection? X <br />b) Police protection? X <br />c) Schools? X <br />d) Parks? X <br />e) Libraries? X <br /> <br />Comments: <br />a) Fire protection? <br />Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR. <br />The Orange County Fire Authority (OCFA) provides fire protection and emergency services to the project <br />area. The Proposed Project would allow for residential uses in place of some of the approved office uses. The <br />5 - 129