My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5 1109 N BROADWAY
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
03-30-20 Special Meeting
>
5 1109 N BROADWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 9:33:47 PM
Creation date
11/9/2020 9:31:36 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O NE B RO A D WA Y P LA Z A P RO J E CT E I R A D DE N DU M CI T Y O F S A NT A A NA <br />5. Environmental Analysis <br />Page 94 PlaceWorks <br />Natural Gas <br />The Certified EIR found that Southern California Gas Company would be served by an existing gas main, and <br />the Approved Project would not require natural gas facilities beyond those planned or readily available or a <br />substantial expansion of existing facilities. The Proposed Project would not substantially increase demands <br />beyond the available supply and with implementation of appropriate mitigation to promote conservation of <br />energy, impacts would remain less than significant and the preparation of a subsequent EIR would not be <br />required. <br />Telecommunications <br />As with the Approved Project, the Proposed Project would result in a less than significant impact to <br />telecommunication services. The Proposed Project would be contained within the building envelope of the <br />Approved Project; therefore, the Proposed Project would not disrupt telecommunication lines with <br />construction. A less than significant impact would occur with regards to telecommunication. The Proposed <br />Project would not create a new significant impact or a substantial increase in the severity of previously identified <br />effects that would require the preparation of a subsequent EIR. <br />Television Signals <br />The Proposed Project would be contained within the building envelope of the Approved Project. As such, the <br />Proposed Project would not add additional building height or expand the building which may contribute further <br />disrupt television signals. The Proposed Project would therefore result in a less than significant impact. The <br />Proposed Project would comply with identified mitigation measures. The Proposed Project would not create a <br />new significant impact or a substantial increase in the severity of previously identified effects that would require <br />the preparation of a subsequent EIR. <br /> Have sufficient water supplies available to serve the project from existing entitlements and <br />resources or are new or expanded entitlements needed? <br />Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR. <br />There is a 12-inch water line adjacent to the Project Site running along Broadway street. According to the Water <br />and Sewer Study prepared by DMc Engineering (dated March 3, 2020, and contained in Appendix C), shows <br />that the current entitled water demand is estimated to be approximately 46,621 gallons per day. The Proposed <br />Project’s estimated water demand is 70,171gpd, as outlined in Table 13 below. <br /> <br />5 - 148
The URL can be used to link to this page
Your browser does not support the video tag.