My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - The Bowery
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
05-11-20
>
3 - The Bowery
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 9:59:32 PM
Creation date
11/9/2020 9:57:23 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The Bowery Mixed-Use Project CEQA Findings of Fact <br /> <br />City of Santa Ana 52 <br />May 2020 <br /> <br />R. Transportation <br /> <br />Impact Finding: The Project would conflict with a program, plan, ordinance, or policy addressing <br />the circulation system, including transit, roadway, bicycle, and pedestrian facilities (Draft EIR at p. <br />5.14-10). <br />Facts in Support of Findings: <br />In the Year 2040 plus Project traffic conditions the Project would result in a significant cumulative <br />impact at the following three intersections, as detailed in Final EIR Transportation Section Table <br />5.14-10: <br />• Grand Avenue/Warner Avenue (#4) in the p.m. peak hour <br />• Red Hill Avenue/Barranca Parkway (#30) in the p.m. peak hour <br />• Red Hill Avenue/Alton Parkway (#32) in the p.m. peak hour <br /> <br />Improvements for impacted intersections have been identified, which would reduce the impacts to a <br />less than significant level. However, improvements at the intersections of Red Hill Avenue/ Barranca Parkway <br />(#30) and Red Hill Avenue/Alton Parkway (#32) cannot be guaranteed because they require approval <br />and/or implementation by the City of Tustin or the City of Irvine. In addition, the improvement at the Grand <br />Avenue/Warner Avenue (#4) is required as a result of a is a cumulative impact, as the intersection operates <br />with unsatisfactory LOS in the baseline 2040 condition. The Project would be responsible for a fair share of <br />the improvement; however, there is no currently planned improvement at the location, and it is unknown if <br />the Grand Avenue/Warner Avenue improvement would be implemented by 2040. Therefore, <br />implementation of the Project would result in a significant and unavoidable impact under the Year 2040 Plus <br />Project condition at these three intersections. <br /> <br /> <br />3-74
The URL can be used to link to this page
Your browser does not support the video tag.