My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - The Bowery
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
05-11-20
>
3 - The Bowery
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 9:59:32 PM
Creation date
11/9/2020 9:57:23 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The Bowery Mixed-Use Project CEQA Findings of Fact <br /> <br />City of Santa Ana 62 <br />May 2020 <br />is to develop housing to assist the City in meeting its jobs/housing balance, which would not occur <br />under this alternative. In addition, this alternative would not provide a development consistent with <br />the Tustin Legacy Specific Plan and IBC, it would not provide an improvement to VMT, and it would <br />not implement SCAG RTP/SCS policies related to providing additional housing near employment <br />centers. Thus, the Build Out of the Existing Land Use and Zoning Alternative would not achieve the <br />Project objectives to the same extent as the proposed Project. The Build Out of the Existing Land <br />Use and Zoning Alternative is rejected on that basis. <br />Environmentally Superior Alternative <br />Section 15126.6(e)(2) of the CEQA Guidelines indicates that an analysis of alternatives to a <br />proposed project shall identify an environmentally superior alternative among the alternatives <br />evaluated in an EIR. The CEQA Guidelines also state that should it be determined that the No Project <br />Alternative is the environmentally superior alternative, the EIR shall identify another environmentally <br />superior alternative among the remaining alternatives. <br />The Build Out of the Existing Land Use and Zoning Alternative would reduce the Project’s significant <br />and unavoidable operational air quality and transportation/traffic impacts to a less than significant <br />level, would implement the existing General Plan land use and zoning designations for the Project <br />site, and would not require a General Plan amendment or zoning change. <br /> <br />However, this alternative would continue to require mitigation related to contaminated soils onsite <br />and tribal cultural resources; and would continue to result in significant and unavoidable impacts <br />related to GHG emissions. Therefore, although the volume of impacts would be less by the Build <br />Out of the Existing Land Use and Zoning Alternative in comparison to the proposed Project, the <br />Build Out of the Existing Land Use and Zoning Alternative would not eliminate all of the significant <br />and unavoidable impacts of the proposed Project or eliminate the need for mitigation. In addition, <br />it would not implement the SCAG policies to the same degree as the proposed Project, because this <br />alternative would not locate new housing near existing jobs and reduce the jobs-housing ratio or <br />the corresponding reduction in vehicle miles traveled. <br /> <br />In addition, the Build Out of the Existing Land Use and Zoning Alternative would not meet many of <br />the Project objectives. The site would not be redeveloped with new housing near existing <br />employment centers, to meet the regions demand for housing or be developed consistent with the <br />redevelopment in the Tustin Legacy Specific Plan area or within the IBC. It would not promote an <br />improved jobs/housing balance and would not meet the related SCAG RTP/SCS land use <br />objectives. <br />CEQA does not require the City of Santa Ana to choose the environmentally superior alternative. <br />Instead, CEQA requires the City to consider environmentally superior alternatives, weigh those <br />considerations against the environmental impacts of the proposed Project, and make findings that <br />the benefits of those considerations outweigh the harm. Based on the considerations described <br />herein, the City of Santa Ana finds that the Build Out of the Existing Land Use and Zoning Alternative <br />is infeasible based on these economic and social factors. <br /> <br />3-84
The URL can be used to link to this page
Your browser does not support the video tag.