My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - The Bowery
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
05-11-20
>
3 - The Bowery
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 9:59:32 PM
Creation date
11/9/2020 9:57:23 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The Bowery Mixed-Use Project CEQA Findings of Fact <br /> <br />City of Santa Ana 68 <br />May 2020 <br />SECTION XI <br />RESOLUTION REGARDING CONTENTS AND CUSTODIAN OF RECORDS <br />The documents and materials that constitute the record of proceedings on which these findings have <br />been based are located at the City of Santa Ana Planning Division Counter. The custodian for these <br />records is the City of Santa Ana. This information is provided in compliance with Public Resources <br />Code section 21081.6. <br />The record of proceedings for the City’s decision on the Project consists of the following documents, <br />at a minimum: <br />1. The NOP and all other public notices issued by the City in conjunction with the Project; <br />2. All comments submitted by agencies or members of the public during the 45-day comment <br />periods on the Draft EIR; <br />3. The Final EIR for the Bowery Mixed-Use Project, including comments received on the Draft <br />EIR, responses to those comments, and technical appendices; <br />4. The Mitigation Monitoring and Reporting Plan for the Project; <br />5. All findings, resolutions and ordinances adopted by the City in connection with the Bowery <br />Mixed-Use Project, and all documents cited or referred to therein; <br />6. All reports, studies, memoranda, maps, staff reports, or other planning documents relating <br />to the Project prepared by the City, consultants to the City, or responsible or trustee agencies <br />with respect to the City’s compliance with the requirements of CEQA and with respect to the <br />City’s action on the Bowery Mixed-Use Project; <br />7. All documents submitted to the City by other public agencies or members of the public in <br />connection with the Bowery Mixed-Use Project up though Project approval. Matters of <br />common knowledge to the City, including, but not limited to Federal, State, and local laws <br />and regulations; <br />8. Any documents expressly cited or referenced in these findings, in addition to those cited <br />above; and <br />9. Any other materials required for the record of proceedings by Public Resources Code <br />section 21167.6, subdivision (e). <br />The following location is where review of the record may be performed: <br /> <br />City of Santa Ana, Planning Division Counter <br />20 Civic Center Plaza, M-20 <br />Santa Ana, CA 92701 <br /> <br /> <br /> <br /> <br /> <br />3-90
The URL can be used to link to this page
Your browser does not support the video tag.