My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AMGT FOR SPACE PLANNING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
25G - AMGT FOR SPACE PLANNING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:55:10 PM
Creation date
11/12/2020 3:22:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Relevant Project Experience <br />Auto Club Enterprises <br />ACE I.S. Restack <br />Costa Mesa, CA <br />Reflecting the Auto Club's motto, "We're Always With You", <br />Gensler regards our client relationship with this same level of <br />commitment. <br />Commencing in the Fall of 2016, Gensler <br />moved quickly into the Programming Phase <br />for Auto Club Enterprise's (ACE) two -floor, <br />104,000 sf Information Systems remodel to <br />create a high -performing workspace that <br />would support their collaborative spirit of <br />working. Situated within an 800,000 sf <br />campus, the c. 1980 building was devoid <br />of daylight. The tunnel corridors and high <br />partitions blocked views and created silos <br />that did not allow for cross communication, <br />much less direct collaboration. Utilizing the <br />advantage of recent building code adoptions, <br />Gensler was able to open up each 52,000 <br />sq. ft. floorplate, resulting in a direct line of <br />sight from one end of the building, through <br />an enclosed atrium, across the floor to the <br />opposite side of the building, infusing the <br />floors with daylight and openness. Creative <br />problem solving with the city allowed the <br />two-hour atrium to be punctuated with <br />millwork framed windows that supported the <br />through -views from each side of the building. <br />With the second floor extending beyond the <br />third floor, Gensler utilized the staggered <br />building footprint to carve out a new <br />1,400 sf roof top deck, which also enlivens <br />the workplace with access to the outside <br />environment. <br />Size <br />104,000 sf <br />Services Provided <br />Visioning <br />Programming Construction <br />Budgeting Schematic <br />Design Construction <br />Documentation <br />Construction Administration <br />Rooftop Deck <br />Atrium Remodel <br />Year Completed <br />2019 <br />Phased, stay in place <br />occupied remodel <br />Client Contact <br />Ms. Marilyn Biscotti, <br />Sr. Strategic Sourcing <br />Consultant <br />biscotti.ma ri lyn@aaa-ca lif com <br />(714) 850-5648 <br />25G-156 <br />Gensler I City of Santa Ana 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.