Laserfiche WebLink
Below is a typical work plan reflecting the usual process and project milestones. Once the full scope is <br />determined, we will tailor a customized schedule for the delivery of the project. <br />KICK-OFFAND <br />CONSENSUS BUILDING <br />DATACOLLECTION& <br />ASSESSMENT <br />PROGRAMMING <br />CONCEPTUAL MASTER <br />I PLANNING <br />PFOJECTTEAM <br />KICK-OFFMEETING <br />BEVIEWEXISTING <br />DOCUMENTATION <br />DISTRIBUTE QUESTION NAME <br />TO REPRESENTATIVES <br />DEFINE, ANALYZE AND <br />DOCUMENT FEASIBILITYOF <br />THE PROPOSED OPTIONS <br />ESTABLISH TEAM <br />RESPONSIBILITIES <br />COMPLETE EXISTING <br />CONDITION SURVEY 5 <br />INVENTORY <br />FACILITATE PROGRAM <br />INTERVIEWS TO IDENTIFY'. <br />-SPECS. <br />- PERSONNEL&SPACE <br />REQUIREMENTS <br />- FUNCTIONAL ADJACENCIES <br />DELIVERABLES/ <br />DOCUMENTATION TO <br />INCLUDE <br />- EXECUTIVE SUMMARY <br />- SPACE NEED ASSESS <br />- SITEMASSING/ STUDIES <br />-CODEANALYSIS <br />-PAFKINGANAF <br />-PR ECTE <br />LESTIMATE <br />-pFE-ESIGN ESTIMATE <br />D <br />- DESIGN GUIDELINES <br />DISCUSS TIMELINE <br />&MILESTONES <br />ASSESS CONFIRM <br />CONDITION OF EXISTING <br />FACILITIES <br />REVIEW <br />PROJECT GOALS <br />DEVELOP PROJECT/ <br />SPACE PROGRAM <br />CONTEXT <br />DEVELOP STUDIES <br />STUDIES <br />STAKEHOLDER <br />WORKSHOP S <br />ALIGN PROPOSED SCHEDULE <br />IDENTIFYSITE <br />OPPORTUNITIES & <br />CONSTRAINTS <br />ANALYZE SUSTAINABLE <br />DESIGN <br />DEVELOP SUSTAINABLE <br />DESIGN CONCEPTS <br />IDENTIFY A COLLECT <br />ADDITIONAL DATA AS <br />RECTIFIED <br />PHANECEING <br />GENERATE IF <br />OPTIONS IF NECESSARY <br />SSARY <br />' ` 06 - <br />1 <br />` + <br />SCHEMATIC <br />DESIGN <br />VALIDATE EXISTING <br />CONDITIONS AND AS BUILT <br />ACCURACY <br />TRANSLATE VISION & <br />PROGRAM INTO DESIGN <br />CONCEPTS <br />DEVELOP BLOCK PLANS <br />TEST FITS, ELEVATIONS, <br />RENDERINGS <br />ANALYZE PRELIMINARY <br />SYSTEMS & BUILDING <br />COMPONENT <br />IDENTIFY & VERIFY CODE/ <br />AGENCY REQUIREMENTS <br />PREPARE COST ESTIMATE <br />PREPARE LEED <br />PROJECT CHECKLIST <br />OUTLINE SPECIFICATIONS <br />INITIATE GOVERNMENTAL <br />AGENCY FEVIE SAS <br />RECTIFIED <br />DESIGN <br />DEVELOPMENT <br />FURTHER DEVELOP& <br />DETAIL INTEGRATED <br />PLANS SECTIONS <br />ELEVATIONS <br />ASSIST USER GROUP WITH <br />FF&E SELECTION <br />ENSURE CODE <br />COMPLIANCE <br />UPDATE COST ESTIMATE <br />INCORPORATE FEED <br />REQUIREMENTS <br />PFOVIDECUALITY <br />CONTROL <br />REFINE SPECIFICATIONS <br />SUBMIT FOR PRELIMINARY <br />PLAN CHECK AS RECTIFIED <br />SELECTCOLOF AND <br />MATERIAL <br />CONSTRUCTION <br />DOCUMENTATION <br />FULLY DEVELOP DETAILED <br />DRAWING SETAND <br />SPECIFICATIONS <br />FEVIE W& COORDINATE <br />WITH SUB CONSULTANTS <br />FINALIZE COST ESTIMATE <br />PROVIDE <br />CONSTRUCTABILITY <br />REVIEW <br />PROVIDE VALUE <br />ENGINEERING AS <br />RECTIFIED <br />INCORPORATE LEED <br />FECUIFEMENTS <br />SUBMIT CONSTRUCTION <br />DOCUMENTS FOR PLAN <br />CHECK AND APPROVALS <br />APPROVALS/ <br />BID+ PERMIT <br />OBTAIN FINAL <br />JURISDICTION REVIEW AND <br />APPROVAL <br />ISSUE BID PACKAGE <br />ASSIST WITH BIDDING <br />PROCESS INCLUDING <br />BID ADVERTISEMENT <br />JOB WALK, ADDENDA <br />PREPARATION, AND <br />FESPONDINGTO BFYS <br />BID EVALUATION <br />AWARD CONTRACT <br />4 <br />CONSTRUCTION <br />ADMINISTRATION <br />PREPARE DETAILED <br />V,OFKPLAN <br />FACILITATE WEEKLY <br />CONSTRUCTION <br />MEETINGS <br />PROVIDE CONSTRUCTION <br />OBSERVATION <br />PROCESS SUBMITTALS & <br />FFYS <br />REVIEW & PROCESS <br />CHANGEOFDEFS <br />r <br />ILE NOTICE OF <br />COMPLETION <br />FY FINAL PAYMENTJECTCLOSE OUTROCESSLEEDERTIFICATION <br />25G-251 <br />City of Santa Ana I SVAArchitects 16 <br />