My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AMGT FOR SPACE PLANNING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
25G - AMGT FOR SPACE PLANNING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:55:10 PM
Creation date
11/12/2020 3:22:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOA ARCHITECTURE <br />RELEVANT PROJECT EXPERIENCE <br />INTERIOR RENOVATION <br />LONG BEACH TRAFFIC MANAGEMENT CENTER <br />Client: City of Long Beach; Construction Cost: $300,000 <br />Architect Team: Edward Lok Ng, Leonardo Arteaga, & Miguel Andrade <br />Started Project in 2012; Project Completed in 2014 <br />Project Description: BOA Architecture was commissioned to design an interior renovation project to <br />transform an existing 1000 S.F. municipal classroom/training room in the basement of the City Hall into a <br />new Traffic Management Center that would have a new conference room with seating capacity of 16 people <br />and new "operations hub" to monitor and assist in the migration of traffic gridlock throughout the City. We <br />worked extensively with our Electrical Engineers and Owner's Users to ensure climate control as the AV <br />equipment are temperature/humidity sensitive. BOA worked with the City's AV Technology and Information <br />Technology consultant to create a function plan to provide utilities and locate equipment, lighting, dedicated <br />server, state-of-the-art new "cube screens" video display, Audio -Visual Technology, and customized <br />workstations. <br />♦ New conference room w seating for 16 <br />people with "operations hub" beyond <br />A New state-of-the-art new <br />"cube screens" video <br />display <br />♦ New customized workstations <br />25G-279 <br />
The URL can be used to link to this page
Your browser does not support the video tag.