My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AMGT FOR SPACE PLANNING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
25G - AMGT FOR SPACE PLANNING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:55:10 PM
Creation date
11/12/2020 3:22:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Space Planning & Architectural Consulting Services (ice <br />Richard Suzuki, P.E., S.E. Structural Engineer: Dale Christian Structural Engineer (DCSE) <br />Years of Collaboration: 17 <br />DCSE Structural Engineers are involve with us on the project from the conceptual design all the way though <br />construction by performing site visits during construction as well as the review of various structural submittals. <br />DCSE's team experienced in all phases of structural engineering and design analysis for different types of <br />structures including mixed -use multi story facility, retail buildings, tilt -up industrial buildings, restaurants, police <br />and fire stations, steel office building and subterranean parking structures. <br />Relevant Recent Projects with GPa: <br />• Mojave Water Agency - New Agency Headquarters Facility and Central Operations Facility <br />• UC Irvine Health - On -Call A/E Services <br />• City of Santa Ana - On -call A/E Services <br />• City of San Gabriel - Municipal Yard Facility <br />• City of Westminster - Maintenance Corporate Yard and Police Department Training Facility <br />• City of Fullerton - Public Facility Yard and CNG Station <br />Hiten Sheth P.E., LEED AP Mechanical, Electrical, and Plumbing Engineer: Gannet Fleming Engineers <br />Years of Collaboration: 3 <br />GF specializes on electrical and mechanical, as well as managing the whole picture of the project. They <br />design and consult on HVAC, electrical and plumbing system design. Their duties include the specification <br />and optimization of cost effective HVAC, electrical and plumbing solutions. GF is also responsible for the <br />calculation and verification of energy compliance with the State Energy Code. <br />Relevant Recent Projects with GPa: <br />• City of Buena Park - Ehlers Community Center <br />• UC Irvine Health - On -Call A/E Services <br />• City of Santa Ana - On -call A/E Services <br />Hashimi 9uazi, Ph.D., P.E., G.E, Principal / Project Manager: Converse Consultants <br />Civil Engineer, CA 46651 <br />Years of Experience: 26 <br />Converse Consultants personnel excels in providing geotechnical engineering services and has earned a <br />reputation for quality work provided in an honest and ethical manner, on time and on budget. Conserve <br />Consultant provides quality control, budget oversight, and technical assistance on various types of projects, <br />including pipelines, wastewater treatment plants, reservoirs, and other related studies. <br />Relevant Recent Projects with GPa: <br />• Mojave Water Agency, New Agency Headquarters Facility, Town of Apple Valley, CA (LEED Gold) <br />• City of Westminster - Maintenance Corporate Yard and Police Department Training Facility <br />• City of San Gabriel- Municipal Yard Facility <br />0 2 rJ �11M1-, M�Morg P Clty of Sanf06 <br />Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.