My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AMGT FOR SPACE PLANNING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
25G - AMGT FOR SPACE PLANNING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:55:10 PM
Creation date
11/12/2020 3:22:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
interior- WRD Headquarters <br />intenor- <br />intenor- <br />Address, 4040 Paramount Bvld Lakewood, California 90712 <br />Project Description: <br />The Water Replenishment <br />District had outgrown its facility <br />and purchased an existing <br />building to meet that shortfall. <br />We provided a detailed needs <br />assessment and Conceptual <br />Design floor plan for WRD's <br />newly purchased facility. Upon <br />approval, we progressed <br />with a full set of construction <br />documents, construction administration services, <br />audiovisual coordination, and complete furniture <br />equipment, and interior design services as well as <br />exterior improvement and retrofitting of the existing <br />building. The 20,OOOSF facility includes a state- <br />of-the-art Board Room facility and conference <br />rooms, office and lease spaces. <br />GPa conducted a thorough code analysis of <br />ADA accessibility, updating the existing building <br />to current code standards. The breath of <br />analysis and design ranged from interior furniture <br />to site modification corresponding with egress <br />requirements, <br />Organizations change and grow over time and <br />we had designed for this in the initial plans. GPa <br />had recently completed the renovation on several <br />spaces within the WRD Headquarters facility to <br />include a new public exhibit space to showcasing <br />the District's mission as well as Water education, <br />Key Personnel: <br />Jack Panichapan - Mr. Panichapan acted as the <br />Principal in Charge and was responsible for the <br />interior design of this tenant improvement project <br />which also included furnishing. <br />Kent bueter - Mr. bueter was the Project Architect <br />and was in charge of the construction documents <br />and construction administration for the project <br />which also included coordinating documents <br />between all the disciplines. <br />Protect Size; 20,000sf <br />Completion Date, 2008/2017 <br />Water District I Wskodo b&: <br />City of Santa Mo- RFP <br />Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.