My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AMGT FOR SPACE PLANNING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
25G - AMGT FOR SPACE PLANNING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:55:10 PM
Creation date
11/12/2020 3:22:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 1BA90275-CO48-437F-ACEC-13F73597F313 <br />WARE Mt1LCOMB <br />ARCHITECTURE PLANNING <br />INTERIORS CIVIL ENGINEERING <br />BRANDING BUILDING MEASUREMENT <br />5. [OPTIONAL] Ware Malcomb has included [# of views in words] (#of views) Revit/ Enscape rendering <br />views per below, with one (1) minor revision per view included (less than 10% change each). To be <br />determined based on specific project scope. <br />6. Ware Malcomb shall attend up to [# of meetings in words] (#of meetings) one -hour meetings for <br />design and review. To be determined based on specific project scope. <br />7. It is anticipated that this phase will be [# of weeks in words] (#of weeks) weeks. To be determined <br />based on specific project scope. <br />E. Design Development Phase: <br />1. Based on the approved Schematic Design, Ware Malcomb shall provide final Design Development to <br />include plans with fixed dimension, elevations, relevant details, electrical and lighting solutions to <br />provide City of Santa Ana a representation of the final design. <br />2. Present final finish palette that shows all materials, finishes and colors. One (1) minor revision (a <br />maximum of 10%) is included. <br />3. [OPTIONAL] Rendered Views that were previously provided will be updated, based on the approved <br />Design Development package, with one (1) minor revision per view included (less than 10% change <br />each). To be determined based on specificprojectscope. <br />4. Provide plans and other design information to Consultants as directed by City of Santa Ana. <br />5. Provide progress prints of plans and other design information for preliminary pricing by a General <br />Contractor and for review by City of Santa Ana. <br />6. Assist City of Santa Ana in evaluating preliminary pricing and other project information. <br />7. Ware Malcomb shall attend up to [# of meetings in words] (#of meetings) one -hour meetings for <br />design and review. To be determined based on specific project scope. <br />8. It is anticipated that this phase will be [# of weeks in words] (#of weeks) weeks. To be determined <br />based on specific project scope. <br />F. Contract Documents Phase: <br />Prepare Contract Documents based on the approved Design Development documents or as authorized by City <br />of Santa Ana. The documents shall set forth in detail the requirements for construction of the project. The <br />scope of work shall include the following: <br />1. Prepare Interior Architectural Contract Documents of the project. A Project Manual is not included, but <br />may be added for an Additional Service. <br />10 Edelman, Irvine, CA 92618 P 949.660.9128 F 9492-8t�d1 ��� <br />a.zazozo once 4 or io <br />
The URL can be used to link to this page
Your browser does not support the video tag.