My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AMGT FOR SPACE PLANNING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
25G - AMGT FOR SPACE PLANNING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:55:10 PM
Creation date
11/12/2020 3:22:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 1BA90275-CO48-437F-ACEC-13F73597F313 <br />WARE Mt1LCOMB <br />ARCHITECTURE PLANNING <br />INTERIORS CIVIL ENGINEERING <br />BRANDING BUILDING MEASUREMENT <br />IV. Supplemental Services: <br />The following items are not contemplated or included within Ware Malcomb's Scope or Fee. Ware Malcomb may perform <br />certain services among the list below as an additional service and for an additional fee. <br />A. ADA Survey <br />B. Workplace Strategy <br />C. Change Management / Communications <br />D. Existing Furniture inventories <br />E. Furniture selection / coordination <br />F. Furniture installation plans of final specifications <br />G. Record drawings <br />H. Perspective or 3D Renderings, Virtual Reality, Panoramic Images, or Animation fly throughs <br />I. Branding services such as Identity/Logo, Stationery System, Branding, Marketing Materials/Leasing Brochures, <br />Website, Multi -Media Presentations, and Environmental Graphics <br />J. Changes to the Program or building area <br />K. Specialty Retail or Salon Fixture Displays / Millwork <br />L. Permits or Agency fees <br />M. Changes or revisions subsequent to completion of Design Development Phase including contractor Value <br />Engineering, except for those required for refinement or code compliance <br />N. Signage or Public Art selection <br />0. Project Manual or Specification Book/Binder <br />P. Landscape Design or Documents <br />Q. Kitchen Design or Consultants <br />R. Preparation of meeting minutes during construction <br />S. Contract Administration more than 15 days beyond date of substantial completion <br />T. Multiple bid processes or negotiations with General Contractors <br />U. Contractor submittal reviews beyond the initial review and one backcheck <br />V. Cost Estimating Services. <br />W. Retaining wall design <br />X. Design of non-standard structural systems due to sub -grade seismic or soils conditions <br />Y. BOMA Calculations <br />Z. Lighting design, audio visual or communication consultants <br />AA. Acoustical design <br />BB. Material Handling Coordination <br />CC. Equipment As-Builts <br />DD. Racking coordination <br />EE. Emergency generator and fuel system design or storage tanks <br />FF. Parcel maps, lot line adjustments, zone changes or environmental clearances <br />GG. Variances or Entitlements, Legal Descriptions, or Special Planning Processes <br />HH. Any and all other services not specifically described as part of the Basic Services <br />10 Edelman, Irvine, CA 92618 P 949.660.9128 F 9492-8t�d1 494 <br />4.20.2020 PAGE 9 d 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.