|
DocuSign Envelope ID: 1BA90275-0048-437F-ACEC-13F73597F313
<br />'"T Ryan Bishoff,
<br />Ryan Bishoff has 12 years with Brandow and Johnston, Irvine office. As Principal, Ryan has worked on many
<br />different projects ranging in size and scope, from major and minor central plant renovations, replacements, and
<br />new construction projects, minor structural alterations, majortenant improvements, to high-rise commercial and
<br />industrial projects. Ryan is involved in the completion of all phases of project development, construction
<br />administration, structural design and system selection, seismic design of major projects, construction
<br />administration of major projects including structural evaluations, renovations and strengthening.
<br />Education:
<br />University of California, Irvine; BSCE
<br />Registrations/Certifications:
<br />Civil Engineer, California No. 77753
<br />Structural Engineer, California No.6250
<br />Experience:
<br />Brandow & Johnston. 2008 -Present
<br />Professional Organizations:
<br />SEAOSC_Structural Engineers Association of Southern California
<br />AISC American Institute of SteelConstruction
<br />ASCE_American Society of Civil Engineers
<br />ACI American Concrete Institute
<br />Instructor.
<br />UC Irvine, Class 181, Senior Engineer Design Class
<br />Outside Client -Consultant, 2008-Present
<br />Structural
<br />Representative Pro "ects:
<br />Restroom Bldg & S�ade Structure
<br />San Juan Capistrano, CA
<br />Sendero Fields, Restroom Bldg. & Shade Structure
<br />San Juan Capistrano, CA
<br />Miller Park, Restroom Bldg. &AmphitheaterStructure
<br />Fontana, CA
<br />Orange Library, Renovation and Expansion
<br />Orange, CA
<br />Fullerton Library Renovation and Expansion
<br />Fullerton, CA
<br />City of Ontario, City Hall Building, City Hall East Interim
<br />Facility, & Bon View Facility Addition and Renovation of
<br />the existing building, Ontario, CA
<br />John Cooper Lab Building Retrofit - Orange CountyPublic
<br />Works, Santa Ana, CA
<br />Chino Police Station, Converting an existing warehouse
<br />building to an essential facility, Renovation and Seismic
<br />Retrofit, Chino, CA
<br />Tower Jazz, Cooling Tower Sound Abatement
<br />Newport Beach, CA
<br />Medtronic- Orangye County Consolidation Project, Addition
<br />& Renovation, R&D Lab & Manufacturing, Design Build
<br />Project, Santa Ana, CA
<br />California State Polytechnic University, Library, 90,000 SF
<br />New Building Addition & Seismic Retrofit of the existing 6
<br />story building with Viscous Dampers, Pomona, CA
<br />Anaheim Convention Center, Car Park 4 Repair
<br />Anaheim, CA
<br />Eaton Fluid Power Group, Mechanical Plant
<br />Irvine, CA
<br />Applied Medical Bridge Building, Central Plant
<br />Lake Forest, CA
<br />Medtronic Orange County Consolidation
<br />New Building And Renovation Of Existing Buildings
<br />Santa Ana, CA
<br />Appplied Medical Campus Tenant Improvement,
<br />Buddmgs B1, B2, B3, B4, Rill, Amp lii, T1 K2,
<br />Rancho Santa Margarita, CA
<br />25G-508
<br />BRAN DOW & JOHNSTON
<br />structural + civil engineers a _— -
<br />
|