My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AMGT FOR SPACE PLANNING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
25G - AMGT FOR SPACE PLANNING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:55:10 PM
Creation date
11/12/2020 3:22:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-1717lllll Ili FTHIITTT7 II�TTT�1771 ITT ITfTI IF <br />hiiin miiii`iei�"9i�r,� <br />�, <br />nnii uinrin r <br />�% <br />to <br />COUNTY OF SAN DIEGO, PHASE I - URBAN CAMP AT THE <br />JUVENILE JUSTICE CENTER <br />San Diego, California <br />The County of San Diego Is In the process <br />of renovating and rebuilding the existing site <br />and campus at the Juvenile Justice Center. <br />The new facility represents a shift away from <br />the correctional model of detention and fully <br />embraces the positive youth development <br />model. In this model, staff will engage youth <br />through the lens of adolescent development and <br />future opportunities. <br />Phase I of the project Includes replacing the girls' <br />rehabilitation facility and urban camp units with <br />a new 131,000 sf,128-bed urban camp facility. <br />This phase Includes community supervision <br />services, juvenile probation center, urban camp <br />setting, and consolidated detention for up to 350 <br />youth and probation administration. The design - <br />build project will also Include new parking Tots, <br />sltework, and a new central plant to serve future <br />phases of the replacement project. Phase 2 will <br />consist of replacing the existing juvenile hall with <br />housing units to accommodate 112 beds. <br />Syska is providing electrical engineering and <br />architectural lighting design services. <br />Project Features <br />Stand-alone medical unit with general and <br />mental health treatment <br />Exceeding Title 24 by at least 20% <br />Design -build Entity <br />Contractor: Balfour Beatty <br />Architect: DLR Group <br />Services Provided <br />Electrical, Architectural Lighting De <br />Size <br />131,000 sf <br />25�523 <br />Completion Date <br />2021 Estimated <br />Construction Cost <br />$112,000,000 <br />Sustainability <br />Pursuing TEED Gold <br />Designed for Zero Net Energy <br />y_A <br />
The URL can be used to link to this page
Your browser does not support the video tag.