Laserfiche WebLink
Table 2 provides a summary of the Project's residential parking supply ratio with implementation of the <br />above -recommended PMP measures. A review of RowA of Table 2 shows that the Project's parking ratio <br />calculates to 1.15 spaces/unit (196 spaces _ 171 units). <br />With implementation of PMP measure No. 3, which would be attained by providing valet parking for the <br />entire parking structure (122 spaces), the Project's parking supply ratio would increase to 1.86 <br />spaces/unit (318 spaces = 196 units) as shown on Row B of Table 2. <br />With implement of PMP measure No. 4 (in addition to PMP No. 3) which would be attained by leasing <br />up to 50 off -site parking spaces within the City -owned parking structure, the Project's parking supply <br />ratio would increase to 2.15 spaces/unit (368 spaces _ 196 units) as shown on Row C of Table 2. <br />Kai SAII111191M <br />This analysis demonstrates that the Project is providing adequate parking supply (a total of 279 spaces <br />for the Residential and Hotel Use). The inclusion of 196 parking spots for the Residential use satisfies the <br />requirements of the California Government Code Section 65915 (p)(1) and the inclusion of 83 parking <br />spaces satisfies the requirements of section 41-1344 of the City of Santa Ana Municipal Code (SAMC). <br />While such an action is not required, applicable PMPs have been identified which would allow the Project <br />to attain the 2.15 blended parking ratio required by the Santa Ana Transit Zoning Code, if it were applied. <br />These findings are consistent with the less than significant findings in the TZC EIR (Long-term cumulative <br />development under the implementation of this Transit Zoning Code would not result in inadequate <br />parking capacity). If you have any questions, please contact me at (949) 660-1994. <br />Respectfully submitted, <br />URBAN CROSSROADS, INC. <br />Haseeb Qureshi <br />Associate Principal <br />75A-173 <br />